IAC logo
IAC Assessment: MI0443
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0443
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Soft Gels
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 190
Plant Area (Sq.Ft.) 72,800
Annual Production 1,700,000,000 Units
Production Hrs. Annual 6,120
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $199,753 3,251,520 kWh $0.06
Electricity Demand $94,367 6,245 kW-months/year $15.11
Electricity Fees $52,770 - $ -
Natural Gas $28,958 7,330 MMBtu $3.95
TOTAL ENERGY COSTS $422,335
RECOMMENDED SAVINGS* $64,808 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$18,913
Cost:
-
- - - - $18,913 - - - -
-
kWh
-
-
kW-months/year
$18,913
-
$
-
-
MMBtu
02: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$14,162
Cost:
$54,938
$9,599 157,374 $4,563 302 - - - - $9,599
157,374
kWh
$4,563
302
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,706
Cost:
$1,980
$6,364 104,330 $2,342 155 - - - - $6,364
104,330
kWh
$2,342
155
kW-months/year
-
-
$
-
-
MMBtu
04: 2.1221 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES Savings:
$7,616
Cost:
$18,760
$5,849 95,890 $2,841 188 - - $(-1,074) (-272) $5,849
95,890
kWh
$2,841
188
kW-months/year
-
-
$
$(-1,074)
(-272)
MMBtu
05: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$6,571
Cost:
$14,916
$4,909 80,467 $1,662 110 - - - - $4,909
80,467
kWh
$1,662
110
kW-months/year
-
-
$
-
-
MMBtu
06: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$4,071
Cost:
$12,390
$2,106 34,520 $997 66 - - $968 245 $2,106
34,520
kWh
$997
66
kW-months/year
-
-
$
$968
245
MMBtu
07: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$3,482
Cost:
$240
- - $3,482 230 - - - - -
-
kWh
$3,482
230
kW-months/year
-
-
$
-
-
MMBtu
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,287
Cost:
$501
$1,287 21,091 - - - - - - $1,287
21,091
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$64,808
Cost:
$103,725
$30,114 493,672 $15,887 1,051 $18,913 - $(-106) (-27) $30,114
493,672
kWh
$15,887
1,051
kW-months/year
$18,913
-
$
$(-106)
(-27)
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas