IAC logo
IAC Assessment: MI0444
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0444
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Woodwork
NAICS 337212 - Custom Architectural Woodwork and Millwork Manufacturing
SIC 2541 - Wood Partitions And Fixtures
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 60,000
Annual Production 30,000,000 Pieces
Production Hrs. Annual 3,120
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,553 945,910 kWh $0.07
Electricity Demand $57,107 4,474 kW-months/year $12.76
Electricity Fees $22,676 - $ -
Fuel Oil #1 $2,400 82 MMBtu $29.27
TOTAL ENERGY COSTS $169,599
RECOMMENDED SAVINGS* $46,927 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Water Disposal One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$12,690
Cost:
$26,240
$7,329 109,394 $5,361 420 - - - - - - $7,329
109,394
kWh
$5,361
420
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,226
Cost:
$1,016
$6,281 93,751 $3,945 309 - - - - - - $6,281
93,751
kWh
$3,945
309
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,757
Cost:
$1,980
$5,634 84,085 $4,123 323 - - - - - - $5,634
84,085
kWh
$4,123
323
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
04: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$5,488
Cost:
$965
$2,075 30,965 $1,213 95 - - - - $2,200 - $2,075
30,965
kWh
$1,213
95
kW-months/year
-
-
Tgal
-
-
Tgal
$2,200
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,005
Cost:
$9,012
$1,520 22,689 $1,485 116 - - - - - - $1,520
22,689
kWh
$1,485
116
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$2,309
Cost:
$5,731
$1,786 26,651 $523 41 - - - - - - $1,786
26,651
kWh
$523
41
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
07: 3.4151 MINIMIZE WATER USAGE Savings:
$1,521
Cost:
$800
- - - - $646 69 $875 69 - - -
-
kWh
-
-
kW-months/year
$646
69
Tgal
$875
69
Tgal
-
-
$
08: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$729
Cost:
$34
$369 5,500 $360 28 - - - - - - $369
5,500
kWh
$360
28
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$717
Cost:
$2,430
$414 6,178 $303 24 - - - - - - $414
6,178
kWh
$303
24
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
10: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$485
Cost:
$903
$485 7,245 - - - - - - - - $485
7,245
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$46,927
Cost:
$49,111
$25,893 386,458 $17,313 1,356 $646 69 $875 69 $2,200 - $25,893
386,458
kWh
$17,313
1,356
kW-months/year
$646
69
Tgal
$875
69
Tgal
$2,200
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Water Usage Water Disposal One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage Water Disposal One-time Revenue or Avoided Cost