IAC Assessment: MI0449
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0449
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product Marine Air Conditioning
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 180
Plant Area (Sq.Ft.) 104,000
Annual Production 50,000 Units
Production Hrs. Annual 2,340
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $126,302 2,060,640 kWh $0.06
Electricity Demand $97,281 6,448 kW-months/year $15.09
Electricity Fees $39,796 - $ -
TOTAL ENERGY COSTS $271,916
RECOMMENDED SAVINGS* $51,569 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,976
Cost:
$61,998
$7,044 115,474 $8,932 592 - - - - - - $7,044
115,474
kWh
$8,932
592
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
02: 3.4159 REPLACE TREATED WATER WITH WELL / SURFACE WATER Savings:
$15,070
Cost:
$13,480
- - - - $16,870 2,075 - - $(-1,800) - -
-
kWh
-
-
kW-months/year
$16,870
2,075
Tgal
-
-
Tgal
$(-1,800)
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,015
Cost:
$1,980
$4,730 77,539 $4,285 284 - - - - - - $4,730
77,539
kWh
$4,285
284
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$6,646
Cost:
$700
$3,143 51,528 $3,983 264 - - - - $(-480) - $3,143
51,528
kWh
$3,983
264
kW-months/year
-
-
Tgal
-
-
Tgal
$(-480)
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,413
Cost:
$3,096
- - $2,413 160 - - - - - - -
-
kWh
$2,413
160
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE Savings:
$1,254
Cost:
$320
$198 3,240 $1,056 70 - - - - - - $198
3,240
kWh
$1,056
70
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
07: 3.4155 METER WASTE WATER Savings:
$1,195
Cost:
$900
- - - - - - $1,195 186 - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$1,195
186
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$51,569
Cost:
$82,474
$15,115 247,781 $20,669 1,370 $16,870 2,075 $1,195 186 $(-2,280) - $15,115
247,781
kWh
$20,669
1,370
kW-months/year
$16,870
2,075
Tgal
$1,195
186
Tgal
$(-2,280)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes Electricity Usage Electricity Demand Water Usage Water Disposal Personnel Changes