IAC logo
IAC Assessment: MI0453
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0453
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2024
Principal Product 1. Piezes, solenoids, switches, 2. Thermoplastics ( contactors and starters)
NAICS 335313 - Switchgear and Switchboard Apparatus Manufacturing
SIC 3613 - Switchgear And Switchboard Apparatus
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 236,000
Annual Production 50,000,000 Units
Production Hrs. Annual 6,656
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $832,093 3,907,609 kWh $0.21
Electricity Demand $89,566 11,166 kW-months/year $8.02
Electricity Fees $5,881 - $ -
TOTAL ENERGY COSTS $927,540
RECOMMENDED SAVINGS* $86,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ Tgal $ $
01: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$43,981
Cost:
$80,000
- - - - $6,444 54 $37,537 - -
-
kWh
-
-
kW-months/year
$6,444
54
Tgal
$37,537
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,805
Cost:
$1,620
$12,841 60,285 $1,964 245 - - - - $12,841
60,285
kWh
$1,964
245
kW-months/year
-
-
Tgal
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$14,219
Cost:
$14,799
$13,313 62,504 $906 113 - - - - $13,313
62,504
kWh
$906
113
kW-months/year
-
-
Tgal
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,976
Cost:
$11,882
$8,405 39,458 $571 71 - - - - $8,405
39,458
kWh
$571
71
kW-months/year
-
-
Tgal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,117
Cost:
$1,690
$4,117 19,329 - - - - - - $4,117
19,329
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$86,098
Cost:
$109,991
$38,676 181,576 $3,441 429 $6,444 54 $37,537 - $38,676
181,576
kWh
$3,441
429
kW-months/year
$6,444
54
Tgal
$37,537
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Water Usage One-time Revenue or Avoided Cost