IAC logo
IAC Assessment: MI0458
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0458
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2025
Principal Product Gears
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 82
Plant Area (Sq.Ft.) 30,000
Annual Production 44,158 Pieces
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,223 977,520 kWh $0.06
Electricity Demand $41,600 3,197 kW-months/year $13.01
Electricity Fees $11,102 - $ -
TOTAL ENERGY COSTS $111,925
RECOMMENDED SAVINGS* $35,695 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,021
Cost:
-
- - $4,021 309 -
-
kWh
$4,021
309
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$24,107
Cost:
$532
$15,366 251,900 $8,741 672 $15,366
251,900
kWh
$8,741
672
kW-months/year
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$636
Cost:
$160
$636 10,419 - - $636
10,419
kWh
-
-
kW-months/year
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,923
Cost:
$7,236
$1,310 21,483 $1,613 124 $1,310
21,483
kWh
$1,613
124
kW-months/year
05: 2.7245 USE DIRECT AIR SUPPLY TO EXHAUST HOODS Savings:
$187
Cost:
$492
$187 3,065 - - $187
3,065
kWh
-
-
kW-months/year
06: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$3,821
Cost:
$10,749
$1,713 28,080 $2,108 162 $1,713
28,080
kWh
$2,108
162
kW-months/year
TOTAL RECOMMENDED Savings:
$35,695
Cost:
$19,169
$19,212 314,947 $16,483 1,267 $19,212
314,947
kWh
$16,483
1,267
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand