Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2025
Principal Product Bread and Pastry
NAICS 311211 - Flour Milling
SIC 2041 - Flour And Other Grain Mill Products
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 24,000
Annual Production 19,760,000 Pounds
Production Hrs. Annual 6,240
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $934,388 4,272,840 kWh $0.22
Electricity Demand $94,954 10,028 kW-months/year $9.47
Electricity Fees $5,370 - $ -
TOTAL ENERGY COSTS $1,034,712
RECOMMENDED SAVINGS* $144,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$53,117
Cost:
$3,200
- - - - $53,117 - -
-
kWh
-
-
kW-months/year
$53,117
-
$
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$46,085
Cost:
$240
$43,508 198,667 $2,577 272 - - $43,508
198,667
kWh
$2,577
272
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$13,405
Cost:
$29,632
- - $13,405 1,416 - - -
-
kWh
$13,405
1,416
kW-months/year
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,111
Cost:
$1,620
$9,316 42,541 $795 84 - - $9,316
42,541
kWh
$795
84
kW-months/year
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,837
Cost:
$3,373
$6,312 28,823 $525 55 - - $6,312
28,823
kWh
$525
55
kW-months/year
-
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,938
Cost:
$8,638
$5,606 25,598 $332 35 - - $5,606
25,598
kWh
$332
35
kW-months/year
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$4,172
Cost:
$100
- - - - $4,172 - -
-
kWh
-
-
kW-months/year
$4,172
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,469
Cost:
$1,976
$3,275 14,955 $194 20 - - $3,275
14,955
kWh
$194
20
kW-months/year
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,057
Cost:
$1,380
$1,057 4,826 - - - - $1,057
4,826
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$144,191
Cost:
$50,159
$69,074 315,410 $17,828 1,882 $57,289 - $69,074
315,410
kWh
$17,828
1,882
kW-months/year
$57,289
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees