IAC logo
IAC Assessment: MO0007
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1990
Principal Product RADIATORS FOR TRUCKS
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 0
Annual Production 300,000 Pieces
Production Hrs. Annual 6,840
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $288,500 5,686,694 kWh $0.05
Natural Gas $64,002 25,027 MMBtu $2.56
LPG $63,399 22,472 MMBtu $2.82
Fuel Oil #2 $2,117 606 MMBtu $3.49
TOTAL ENERGY COSTS $418,018
RECOMMENDED SAVINGS* $32,642 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,428
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$14,971
Cost:
$900
- - $14,971 5,848 -
-
kWh
$14,971
5,848
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$12,118
Cost:
$15,000
- - $12,118 4,734 -
-
kWh
$12,118
4,734
MMBtu
03: 2.2444 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS Savings:
$4,096
Cost:
$8,000
- - $4,096 1,600 -
-
kWh
$4,096
1,600
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$795
Cost:
$306
$795 15,826 - - $795
15,826
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$662
Cost:
-
$662 13,189 - - $662
13,189
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$32,642
Cost:
$24,206
$1,457 29,015 $31,185 12,182 $1,457
29,015
kWh
$31,185
12,182
MMBtu
TOTAL IMPLEMENTED Savings:
$16,428
Cost:
$1,206
$1,457 29,015 $14,971 5,848 $1,457
29,015
kWh
$14,971
5,848
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas