IAC logo
IAC Assessment: MO0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1992
Principal Product CIRCUIT BREAKERS
NAICS n/a
SIC 3679 - Electronic Components, Nec
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 0
Annual Production 1,520,000 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $625,758 10,556,565 kWh $0.06
TOTAL ENERGY COSTS $625,758
RECOMMENDED SAVINGS* $96,088 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $49,637
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$47,665
Cost:
$29,000
$82,015 1,383,939 $(-34,350) (-5,725) $82,015
1,383,939
kWh
$(-34,350)
(-5,725)
MMBtu
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$5,312
Cost:
-
$9,252 156,213 $(-3,940) (-657) $9,252
156,213
kWh
$(-3,940)
(-657)
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$959
Cost:
-
$959 16,120 - - $959
16,120
kWh
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,537
Cost:
$958
$4,537 76,495 - - $4,537
76,495
kWh
-
-
MMBtu
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,972
Cost:
$5,350
$1,972 33,411 - - $1,972
33,411
kWh
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,845
Cost:
-
$1,845 31,067 - - $1,845
31,067
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$29,176
Cost:
$3,956
$29,176 492,380 - - $29,176
492,380
kWh
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,123
Cost:
$3,321
$2,123 36,928 - - $2,123
36,928
kWh
-
-
MMBtu
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,499
Cost:
$50
$2,499 42,204 - - $2,499
42,204
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$96,088
Cost:
$42,635
$134,378 2,268,757 $(-38,290) (-6,382) $134,378
2,268,757
kWh
$(-38,290)
(-6,382)
MMBtu
TOTAL IMPLEMENTED Savings:
$49,637
Cost:
$34,350
$83,987 1,417,350 $(-34,350) (-5,725) $83,987
1,417,350
kWh
$(-34,350)
(-5,725)
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas