Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1995
Principal Product Electric Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 145,000
Annual Production 150,000 Units
Production Hrs. Annual 6,120
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,352 12,644,490 kWh $0.05
LPG $90,472 20,672 MMBtu $4.38
TOTAL ENERGY COSTS $825,893
RECOMMENDED SAVINGS* $81,041 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,472
#|Description Savings
Cost
Status Electricity Usage Water Disposal Solid Waste (non-haz) Electricity Usage Water Disposal Solid Waste (non-haz)
$ kWh $ Tgal $ lb
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$27,601
Cost:
$17,901
$27,601 109,906 - - - - $27,601
109,906
kWh
-
-
Tgal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,472
Cost:
$15,370
$4,472 83,822 - - - - $4,472
83,822
kWh
-
-
Tgal
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$530
Cost:
$25
$530 10,258 - - - - $530
10,258
kWh
-
-
Tgal
-
-
lb
04: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$9,918
Cost:
$2,845
$(-223) (-4,982) $10,141 4,716,684 - - $(-223)
(-4,982)
kWh
$10,141
4,716,684
Tgal
-
-
lb
05: 3.1163 USE PLASTIC PALLETS INSTEAD OF WOOD Savings:
$38,520
Cost:
$36,113
- - - - $38,520 1,337,500 -
-
kWh
-
-
Tgal
$38,520
1,337,500
lb
TOTAL RECOMMENDED Savings:
$81,041
Cost:
$72,254
$32,380 199,004 $10,141 4,716,684 $38,520 1,337,500 $32,380
199,004
kWh
$10,141
4,716,684
Tgal
$38,520
1,337,500
lb
TOTAL IMPLEMENTED Savings:
$4,472
Cost:
$15,370
$4,472 83,822 - - - - $4,472
83,822
kWh
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ Tgal $ lb