IAC Assessment: MO0167
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0167
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Urethane, Epoxy, and other coatings
NAICS n/a
SIC 2821 - Plastics Materials And Resins
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 135,000
Annual Production 700 Thousand Gallons
Production Hrs. Annual 4,160
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $110,159 2,062,134 kWh $0.05
Electricity Demand $12,992 5,685 kW-months/year $2.29
TOTAL ENERGY COSTS $137,457
RECOMMENDED SAVINGS* $10,938 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,394
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,288
Cost:
$1,980
$1,145 18,171 $143 76 - - $1,145
18,171
kWh
$143
76
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,040
Cost:
$5,272
$2,703 42,497 $337 178 - - $2,703
42,497
kWh
$337
178
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$265
Cost:
-
$255 4,103 $10 5 - - $255
4,103
kWh
$10
5
kW-months/year
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$810
Cost:
$65
$745 11,723 $65 34 - - $745
11,723
kWh
$65
34
kW-months/year
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,504
Cost:
$60
$2,244 35,463 $260 137 - - $2,244
35,463
kWh
$260
137
kW-months/year
-
-
lb
06: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$599
Cost:
$69
$538 8,499 $61 32 - - $538
8,499
kWh
$61
32
kW-months/year
-
-
lb
07: 2.6121 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED Savings:
$411
Cost:
$60
$356 5,569 $55 29 - - $356
5,569
kWh
$55
29
kW-months/year
-
-
lb
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$2,021
Cost:
$9,925
- - - - $2,021 39,420 -
-
kWh
-
-
kW-months/year
$2,021
39,420
lb
TOTAL RECOMMENDED Savings:
$10,938
Cost:
$17,431
$7,986 126,025 $931 491 $2,021 39,420 $7,986
126,025
kWh
$931
491
kW-months/year
$2,021
39,420
lb
TOTAL IMPLEMENTED Savings:
$5,394
Cost:
$12,099
$3,039 48,065 $334 176 $2,021 39,420 $3,039
48,065
kWh
$334
176
kW-months/year
$2,021
39,420
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)