IAC logo
IAC Assessment: MO0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Remanufactured Diesel Engines
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $50,000,000-$100,000,000
# of Employees 336
Plant Area (Sq.Ft.) 67,200
Annual Production 10,000 Units
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,002 3,055,979 kWh $0.03
Electricity Demand $37,192 6,792 kW-months/year $5.48
Natural Gas $77,531 18,596 MMBtu $4.17
TOTAL ENERGY COSTS $192,175
RECOMMENDED SAVINGS* $22,279 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,329
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,139
Cost:
$6,136
$2,254 76,202 $885 174 - - - - - - - - $2,254
76,202
kWh
$885
174
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$172
Cost:
-
$139 4,689 $33 6 - - - - - - - - $139
4,689
kWh
$33
6
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,375
Cost:
$174
$1,024 34,584 $351 70 - - - - - - - - $1,024
34,584
kWh
$351
70
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$208
Cost:
$100
$155 5,275 $53 10 - - - - - - - - $155
5,275
kWh
$53
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.8113 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER Savings:
$16,272
Cost:
$2,280
- - - - - - - - $16,272 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$16,272
-
$
-
-
$
06: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$303
Cost:
$850
- - - - $303 73 - - - - - - -
-
kWh
-
-
kW-months/year
$303
73
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$810
Cost:
$100
- - - - - - $450 24,000 - - $360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$450
24,000
lb
-
-
$
$360
-
$
TOTAL RECOMMENDED Savings:
$22,279
Cost:
$9,640
$3,572 120,750 $1,322 260 $303 73 $450 24,000 $16,272 - $360 - $3,572
120,750
kWh
$1,322
260
kW-months/year
$303
73
MMBtu
$450
24,000
lb
$16,272
-
$
$360
-
$
TOTAL IMPLEMENTED Savings:
$4,329
Cost:
$6,336
$2,548 86,166 $971 190 - - $450 24,000 - - $360 - $2,548
86,166
kWh
$971
190
kW-months/year
-
-
MMBtu
$450
24,000
lb
-
-
$
$360
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Ancillary Material Cost By-product Production