Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Commercial Offset Printing
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 40,000
Annual Production 60,000,000 Units
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,189 1,455,744 kWh $0.05
Electricity Demand $10,891 4,941 kW-months/year $2.20
TOTAL ENERGY COSTS $104,327
RECOMMENDED SAVINGS* $16,970 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,838
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste
$ kWh $ kW-months/year $ gal $ lb $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,266
Cost:
$537
$1,173 19,343 $93 49 - - - - - - $1,173
19,343
kWh
$93
49
kW-months/year
-
-
gal
-
-
lb
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$212
Cost:
-
$203 3,224 $9 5 - - - - - - $203
3,224
kWh
$9
5
kW-months/year
-
-
gal
-
-
lb
-
-
lb
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$25
Cost:
-
$20 293 $5 2 - - - - - - $20
293
kWh
$5
2
kW-months/year
-
-
gal
-
-
lb
-
-
lb
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$335
Cost:
$80
$299 4,982 $36 19 - - - - - - $299
4,982
kWh
$36
19
kW-months/year
-
-
gal
-
-
lb
-
-
lb
05: 3.5121 RECYCLE WASTE INK AND CLEANUP SOLVENT Savings:
$10,800
Cost:
$500
- - - - $10,800 1,980 - - - - -
-
kWh
-
-
kW-months/year
$10,800
1,980
gal
-
-
lb
-
-
lb
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$586
Cost:
$545
- - - - - - $586 450 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$586
450
lb
-
-
lb
07: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$3,746
Cost:
-
- - - - - - - - $3,746 4,444 -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$3,746
4,444
lb
TOTAL RECOMMENDED Savings:
$16,970
Cost:
$1,662
$1,695 27,842 $143 75 $10,800 1,980 $586 450 $3,746 4,444 $1,695
27,842
kWh
$143
75
kW-months/year
$10,800
1,980
gal
$586
450
lb
$3,746
4,444
lb
TOTAL IMPLEMENTED Savings:
$1,838
Cost:
$617
$1,695 27,842 $143 75 - - - - - - $1,695
27,842
kWh
$143
75
kW-months/year
-
-
gal
-
-
lb
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ lb
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Gaseous Waste