Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1996 |
Principal Product | Men's Work Shoes |
NAICS | n/a |
SIC | 3143 - Men's Footwear, Except Athletic |
Sales | $10,000,000-$50,000,000 |
# of Employees | 320 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 500,000 Pieces |
Production Hrs. Annual | 2,200 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $141,472 | 2,726,846 | kWh | $0.05 |
Electricity Demand | $20,374 | 12,181 | kW-months/year | $1.67 |
Natural Gas | $11,787 | 2,432 | MMBtu | $4.85 |
TOTAL ENERGY COSTS | $175,583 | |||
RECOMMENDED SAVINGS* | $7,898 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $3,527 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $3,043 Cost: $5,437 |
$2,784 | 49,824 | $259 | 284 | - | - |
$2,784 49,824 kWh |
$259 284 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $191 Cost: - |
$187 | 3,224 | $4 | 5 | - | - |
$187 3,224 kWh |
$4 5 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $484 Cost: - |
$435 | 7,913 | $49 | 54 | - | - |
$435 7,913 kWh |
$49 54 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $872 Cost: $360 |
$793 | 14,361 | $79 | 86 | - | - |
$793 14,361 kWh |
$79 86 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,156 Cost: $120 |
$1,052 | 18,757 | $104 | 114 | - | - |
$1,052 18,757 kWh |
$104 114 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4314 USE SYNTHETIC LUBRICANT |
Savings: $202 Cost: $416 |
$177 | 3,224 | $25 | 28 | - | - |
$177 3,224 kWh |
$25 28 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $1,950 Cost: - |
- | - | - | - | $1,950 | 166,750 |
- - kWh |
- - kW-months/year |
$1,950 166,750 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $7,898 Cost: $6,333 |
$5,428 | 97,303 | $520 | 571 | $1,950 | 166,750 | $5,428 97,303 kWh |
$520 571 kW-months/year |
$1,950 166,750 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $3,527 Cost: $5,437 |
$3,219 | 57,737 | $308 | 338 | - | - | $3,219 57,737 kWh |
$308 338 kW-months/year |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Solid Waste (non-haz) |