Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1996 |
Principal Product | Chemical Instant Ice Packs, Instant Hot Packs |
NAICS | n/a |
SIC | 2813 - Industrial Gases |
Sales | $10,000,000-$50,000,000 |
# of Employees | 80 |
Plant Area (Sq.Ft.) | 45,000 |
Annual Production | 13,000,000 Pieces |
Production Hrs. Annual | 4,420 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $53,822 | 939,625 | kWh | $0.06 |
Electricity Demand | $5,943 | 2,967 | kW-months/year | $2.00 |
Natural Gas | $2,025 | 352 | MMBtu | $5.75 |
TOTAL ENERGY COSTS | $63,807 | |||
RECOMMENDED SAVINGS* | $60,224 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $56,604 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.441 INSTALL AUTOMATIC PACKING EQUIPMENT |
Savings: $47,917 Cost: $136,000 |
- | - | - | - | $2,017 | 24,225 | $45,900 | - | - | - |
- - kWh |
- - kW-months/year |
$2,017 24,225 lb |
$45,900 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT |
Savings: $3,620 Cost: $625 |
- | - | - | - | - | - | - | - | $3,620 | - |
- - kWh |
- - kW-months/year |
- - lb |
- - $ |
$3,620 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,247 Cost: $80 |
$2,139 | 37,222 | $108 | 72 | - | - | - | - | - | - |
$2,139 37,222 kWh |
$108 72 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,490 Cost: $250 |
$2,371 | 41,325 | $119 | 79 | - | - | - | - | - | - |
$2,371 41,325 kWh |
$119 79 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,274 Cost: $5,576 |
$2,084 | 36,342 | $190 | 126 | - | - | - | - | - | - |
$2,084 36,342 kWh |
$190 126 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,556 Cost: $1,410 |
$1,442 | 25,205 | $114 | 76 | - | - | - | - | - | - |
$1,442 25,205 kWh |
$114 76 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $120 Cost: - |
$116 | 2,052 | $4 | 2 | - | - | - | - | - | - |
$116 2,052 kWh |
$4 2 kW-months/year |
- - lb |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,224 Cost: $143,941 |
$8,152 | 142,146 | $535 | 355 | $2,017 | 24,225 | $45,900 | - | $3,620 | - | $8,152 142,146 kWh |
$535 355 kW-months/year |
$2,017 24,225 lb |
$45,900 - $ |
$3,620 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $56,604 Cost: $143,316 |
$8,152 | 142,146 | $535 | 355 | $2,017 | 24,225 | $45,900 | - | - | - | $8,152 142,146 kWh |
$535 355 kW-months/year |
$2,017 24,225 lb |
$45,900 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (haz) | Personnel Changes | Ancillary Material Cost |