IAC logo
IAC Assessment: MO0194
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0194
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1996
Principal Product Brake/Light-Duty Cables
NAICS n/a
SIC 3315 - Steel Wire And Related Products
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 98,100
Annual Production 8,400,000 Pieces
Production Hrs. Annual 6,000
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $104,281 3,710,727 kWh $0.03
Electricity Demand $94,750 9,692 kW-months/year $9.78
Natural Gas $47,791 8,999 MMBtu $5.31
TOTAL ENERGY COSTS $268,662
RECOMMENDED SAVINGS* $23,013 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,725
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,051
Cost:
$3,760
$976 34,877 $1,075 118 - - $976
34,877
kWh
$1,075
118
kW-months/year
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$945
Cost:
$1,527
$462 16,413 $483 53 - - $462
16,413
kWh
$483
53
kW-months/year
-
-
lb
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,753
Cost:
$264
$1,196 42,497 $1,557 170 - - $1,196
42,497
kWh
$1,557
170
kW-months/year
-
-
lb
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,976
Cost:
-
$1,121 39,859 $855 94 - - $1,121
39,859
kWh
$855
94
kW-months/year
-
-
lb
05: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$15,288
Cost:
-
- - - - $15,288 218,400 -
-
kWh
-
-
kW-months/year
$15,288
218,400
lb
TOTAL RECOMMENDED Savings:
$23,013
Cost:
$5,551
$3,755 133,646 $3,970 435 $15,288 218,400 $3,755
133,646
kWh
$3,970
435
kW-months/year
$15,288
218,400
lb
TOTAL IMPLEMENTED Savings:
$7,725
Cost:
$5,551
$3,755 133,646 $3,970 435 - - $3,755
133,646
kWh
$3,970
435
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)