Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1997 |
Principal Product | Custom-Fabricated Stainless Steel Products |
NAICS | n/a |
SIC | 3499 - Fabricated Metal Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 240 |
Plant Area (Sq.Ft.) | 120,000 |
Annual Production | 638 Pieces |
Production Hrs. Annual | 4,800 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,189 | 2,257,327 | kWh | $0.02 |
Electricity Demand | $38,627 | 6,547 | kW-months/year | $5.90 |
Natural Gas | $12,234 | 2,835 | MMBtu | $4.32 |
TOTAL ENERGY COSTS | $111,820 | |||
RECOMMENDED SAVINGS* | $23,312 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $8,485 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM |
Savings: $7,839 Cost: $15,000 |
- | - | - | - | - | - | - | - | $7,839 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$7,839 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $4,725 Cost: $10,000 |
- | - | - | - | - | - | - | - | $4,725 | - |
- - kWh |
- - kW-months/year |
- - gal |
- - lb |
$4,725 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,218 Cost: $4,096 |
$1,440 | 51,876 | $778 | 11 | - | - | - | - | - | - |
$1,440 51,876 kWh |
$778 11 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,048 Cost: $1,583 |
$683 | 24,326 | $365 | 5 | - | - | - | - | - | - |
$683 24,326 kWh |
$365 5 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $215 Cost: - |
$146 | 4,982 | $69 | 1 | - | - | - | - | - | - |
$146 4,982 kWh |
$69 1 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,497 Cost: $197 |
$1,629 | 57,737 | $868 | 13 | - | - | - | - | - | - |
$1,629 57,737 kWh |
$868 13 kW-months/year |
- - gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE |
Savings: $4,550 Cost: - |
- | - | - | - | - | - | $4,550 | 66 | - | - |
- - kWh |
- - kW-months/year |
- - gal |
$4,550 66 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 3.5143 RETURN SPENT SOLUTIONS TO THE MANUFACTURER |
Savings: $220 Cost: - |
- | - | - | - | $220 | 110 | - | - | - | - |
- - kWh |
- - kW-months/year |
$220 110 gal |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $23,312 Cost: $30,876 |
$3,898 | 138,921 | $2,080 | 30 | $220 | 110 | $4,550 | 66 | $12,564 | - | $3,898 138,921 kWh |
$2,080 30 kW-months/year |
$220 110 gal |
$4,550 66 lb |
$12,564 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $8,485 Cost: $11,780 |
$2,458 | 87,045 | $1,302 | 19 | - | - | - | - | $4,725 | - | $2,458 87,045 kWh |
$1,302 19 kW-months/year |
- - gal |
- - lb |
$4,725 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | gal | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Other Liquid (haz) | Solid Waste (non-haz) | Ancillary Material Cost |