IAC Assessment: MO0196
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Custom-Fabricated Stainless Steel Products
NAICS n/a
SIC 3499 - Fabricated Metal Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 120,000
Annual Production 638 Pieces
Production Hrs. Annual 4,800
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $56,189 2,257,327 kWh $0.02
Electricity Demand $38,627 6,547 kW-months/year $5.90
Natural Gas $12,234 2,835 MMBtu $4.32
TOTAL ENERGY COSTS $111,820
RECOMMENDED SAVINGS* $23,312 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$7,839
Cost:
$15,000
- - - - - - - - $7,839 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$7,839
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$4,725
Cost:
$10,000
- - - - - - - - $4,725 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$4,725
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,218
Cost:
$4,096
$1,440 51,876 $778 11 - - - - - - $1,440
51,876
kWh
$778
11
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,048
Cost:
$1,583
$683 24,326 $365 5 - - - - - - $683
24,326
kWh
$365
5
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$215
Cost:
-
$146 4,982 $69 1 - - - - - - $146
4,982
kWh
$69
1
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,497
Cost:
$197
$1,629 57,737 $868 13 - - - - - - $1,629
57,737
kWh
$868
13
kW-months/year
-
-
gal
-
-
lb
-
-
$
07: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$4,550
Cost:
-
- - - - - - $4,550 66 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,550
66
lb
-
-
$
08: 3.5143 RETURN SPENT SOLUTIONS TO THE MANUFACTURER Savings:
$220
Cost:
-
- - - - $220 110 - - - - -
-
kWh
-
-
kW-months/year
$220
110
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$23,312
Cost:
$30,876
$3,898 138,921 $2,080 30 $220 110 $4,550 66 $12,564 - $3,898
138,921
kWh
$2,080
30
kW-months/year
$220
110
gal
$4,550
66
lb
$12,564
-
$
TOTAL IMPLEMENTED Savings:
$8,485
Cost:
$11,780
$2,458 87,045 $1,302 19 - - - - $4,725 - $2,458
87,045
kWh
$1,302
19
kW-months/year
-
-
gal
-
-
lb
$4,725
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (haz) Solid Waste (non-haz) Ancillary Material Cost