IAC logo
IAC Assessment: MO0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Small Engines
NAICS n/a
SIC 3519 - Internal Combustion Engines, Nec
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 252,000
Annual Production 539,250 Pieces
Production Hrs. Annual 8,232
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Demand $574,646 54,332 kW-months/year $10.58
Electricity Fees $100,349 - $ -
Natural Gas $349,326 68,290 MMBtu $5.12
TOTAL ENERGY COSTS $1,123,321
RECOMMENDED SAVINGS* $347,402 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $344,524
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ $
01: 3.4112 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER Savings:
$216,153
Cost:
$80,000
- - - - $216,153 4,380 - - -
-
kWh
-
-
kW-months/year
$216,153
4,380
gal
-
-
$
02: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$20,939
Cost:
$19,000
- - - - $20,939 178,278 - - -
-
kWh
-
-
kW-months/year
$20,939
178,278
gal
-
-
$
03: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$25,800
Cost:
$20,000
- - - - - - $25,800 - -
-
kWh
-
-
kW-months/year
-
-
gal
$25,800
-
$
04: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$18,045
Cost:
$15,000
- - - - - - $18,045 - -
-
kWh
-
-
kW-months/year
-
-
gal
$18,045
-
$
05: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$10,080
Cost:
$10,000
- - - - - - $10,080 - -
-
kWh
-
-
kW-months/year
-
-
gal
$10,080
-
$
06: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$4,940
Cost:
$9,500
- - - - - - $4,940 - -
-
kWh
-
-
kW-months/year
-
-
gal
$4,940
-
$
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$38,120
Cost:
$550
$38,120 1,279,601 - - - - - - $38,120
1,279,601
kWh
-
-
kW-months/year
-
-
gal
-
-
$
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$10,447
Cost:
$28,282
$7,070 237,397 $3,377 50 - - - - $7,070
237,397
kWh
$3,377
50
kW-months/year
-
-
gal
-
-
$
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,878
Cost:
$80
$2,246 75,322 $632 9 - - - - $2,246
75,322
kWh
$632
9
kW-months/year
-
-
gal
-
-
$
TOTAL RECOMMENDED Savings:
$347,402
Cost:
$182,412
$47,436 1,592,320 $4,009 59 $237,092 182,658 $58,865 - $47,436
1,592,320
kWh
$4,009
59
kW-months/year
$237,092
182,658
gal
$58,865
-
$
TOTAL IMPLEMENTED Savings:
$344,524
Cost:
$182,332
$45,190 1,516,998 $3,377 50 $237,092 182,658 $58,865 - $45,190
1,516,998
kWh
$3,377
50
kW-months/year
$237,092
182,658
gal
$58,865
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Ancillary Material Cost