IAC logo
IAC Assessment: MO0205
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0205
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Extruded Plastic Pellets
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 50,000
Annual Production 10,200,000 Pieces
Production Hrs. Annual 4,368
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,668 3,599,941 kWh $0.05
Electricity Demand $23,208 1,008 kW-months/year $23.02
Electricity Fees $10,653 - $ -
Natural Gas $16,796 2,720 MMBtu $6.18
TOTAL ENERGY COSTS $247,969
RECOMMENDED SAVINGS* $48,015 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $42,303
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.7110 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$12,804
Cost:
$25,000
- - - - - - $12,804 - -
-
kWh
-
-
kW-months/year
-
-
lb
$12,804
-
$
02: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$10,000
Cost:
$12,500
- - - - - - $10,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$10,000
-
$
03: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$7,328
Cost:
$20,000
- - - - - - $7,328 - -
-
kWh
-
-
kW-months/year
-
-
lb
$7,328
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,145
Cost:
$1,880
$1,025 19,930 $120 5 - - - - $1,025
19,930
kWh
$120
5
kW-months/year
-
-
lb
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$505
Cost:
$677
$454 8,792 $51 2 - - - - $454
8,792
kWh
$51
2
kW-months/year
-
-
lb
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$109
Cost:
$207
$104 2,052 $5 1 - - - - $104
2,052
kWh
$5
1
kW-months/year
-
-
lb
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$828
Cost:
$100
$773 14,947 $55 2 - - - - $773
14,947
kWh
$55
2
kW-months/year
-
-
lb
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,652
Cost:
$5,692
$2,357 45,721 $295 13 - - - - $2,357
45,721
kWh
$295
13
kW-months/year
-
-
lb
-
-
$
09: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$5,712
Cost:
-
- - - - $5,712 204 - - -
-
kWh
-
-
kW-months/year
$5,712
204
lb
-
-
$
10: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,932
Cost:
$4,860
- - - - $6,932 120,000 - - -
-
kWh
-
-
kW-months/year
$6,932
120,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$48,015
Cost:
$70,916
$4,713 91,442 $526 23 $12,644 120,204 $30,132 - $4,713
91,442
kWh
$526
23
kW-months/year
$12,644
120,204
lb
$30,132
-
$
TOTAL IMPLEMENTED Savings:
$42,303
Cost:
$70,916
$4,713 91,442 $526 23 $6,932 120,000 $30,132 - $4,713
91,442
kWh
$526
23
kW-months/year
$6,932
120,000
lb
$30,132
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost