Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1997 |
Principal Product | Hardwood Flooring |
NAICS | n/a |
SIC | 2426 - Hardwood Dimension & Flooring Mills |
Sales | $10,000,000-$50,000,000 |
# of Employees | 120 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 9,000,000 Thousand Feet |
Production Hrs. Annual | 2,600 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $107,205 | 3,186,987 | kWh | $0.03 |
Electricity Demand | $43,881 | 1,127 | kW-months/year | $38.94 |
Electricity Fees | $9,425 | - | $ | - |
TOTAL ENERGY COSTS | $210,511 | |||
RECOMMENDED SAVINGS* | $77,778 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,308 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM |
Savings: $14,170 Cost: $25,000 |
- | - | - | - | - | - | $14,170 | - |
- - kWh |
- - kW-months/year |
- - lb |
$14,170 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME |
Savings: $5,072 Cost: $15,000 |
- | - | - | - | - | - | $5,072 | - |
- - kWh |
- - kW-months/year |
- - lb |
$5,072 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $3,600 Cost: $10,000 |
- | - | - | - | - | - | $3,600 | - |
- - kWh |
- - kW-months/year |
- - lb |
$3,600 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY |
Savings: $3,769 Cost: $3,743 |
$2,675 | 72,978 | $1,094 | 28 | - | - | - | - |
$2,675 72,978 kWh |
$1,094 28 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $870 Cost: - |
$617 | 16,999 | $253 | 7 | - | - | - | - |
$617 16,999 kWh |
$253 7 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $297 Cost: $40 |
$211 | 5,862 | $86 | 2 | - | - | - | - |
$211 5,862 kWh |
$86 2 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $50,000 Cost: $2,000 |
- | - | - | - | $50,000 | 10,000 | - | - |
- - kWh |
- - kW-months/year |
$50,000 10,000 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $77,778 Cost: $55,783 |
$3,503 | 95,839 | $1,433 | 37 | $50,000 | 10,000 | $22,842 | - | $3,503 95,839 kWh |
$1,433 37 kW-months/year |
$50,000 10,000 lb |
$22,842 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,308 Cost: $45,783 |
$2,886 | 78,840 | $1,180 | 30 | $50,000 | 10,000 | $19,242 | - | $2,886 78,840 kWh |
$1,180 30 kW-months/year |
$50,000 10,000 lb |
$19,242 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Ancillary Material Cost |