IAC logo
IAC Assessment: MO0219
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0219
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1997
Principal Product Hardwood Flooring
NAICS n/a
SIC 2426 - Hardwood Dimension & Flooring Mills
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 90,000
Annual Production 9,000,000 Thousand Feet
Production Hrs. Annual 2,600
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $107,205 3,186,987 kWh $0.03
Electricity Demand $43,881 1,127 kW-months/year $38.94
Electricity Fees $9,425 - $ -
TOTAL ENERGY COSTS $210,511
RECOMMENDED SAVINGS* $77,778 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $73,308
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $
01: 4.711 INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM Savings:
$14,170
Cost:
$25,000
- - - - - - $14,170 - -
-
kWh
-
-
kW-months/year
-
-
lb
$14,170
-
$
02: 4.432 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$5,072
Cost:
$15,000
- - - - - - $5,072 - -
-
kWh
-
-
kW-months/year
-
-
lb
$5,072
-
$
03: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$3,600
Cost:
$10,000
- - - - - - $3,600 - -
-
kWh
-
-
kW-months/year
-
-
lb
$3,600
-
$
04: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$3,769
Cost:
$3,743
$2,675 72,978 $1,094 28 - - - - $2,675
72,978
kWh
$1,094
28
kW-months/year
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$870
Cost:
-
$617 16,999 $253 7 - - - - $617
16,999
kWh
$253
7
kW-months/year
-
-
lb
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$297
Cost:
$40
$211 5,862 $86 2 - - - - $211
5,862
kWh
$86
2
kW-months/year
-
-
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$50,000
Cost:
$2,000
- - - - $50,000 10,000 - - -
-
kWh
-
-
kW-months/year
$50,000
10,000
lb
-
-
$
TOTAL RECOMMENDED Savings:
$77,778
Cost:
$55,783
$3,503 95,839 $1,433 37 $50,000 10,000 $22,842 - $3,503
95,839
kWh
$1,433
37
kW-months/year
$50,000
10,000
lb
$22,842
-
$
TOTAL IMPLEMENTED Savings:
$73,308
Cost:
$45,783
$2,886 78,840 $1,180 30 $50,000 10,000 $19,242 - $2,886
78,840
kWh
$1,180
30
kW-months/year
$50,000
10,000
lb
$19,242
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Ancillary Material Cost