IAC logo
IAC Assessment: MO0234
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0234
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Combat Boots
NAICS n/a
SIC 3143 - Men's Footwear, Except Athletic
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 113,000
Annual Production 500,000 Pieces
Production Hrs. Annual 6,240
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $137,743 2,854,631 kWh $0.05
Electricity Demand $95,504 1,091 kW-months/year $87.54
Electricity Fees $37,738 - $ -
Natural Gas $10,503 1,886 MMBtu $5.57
TOTAL ENERGY COSTS $341,981
RECOMMENDED SAVINGS* $77,171 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,678
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$11,260
Cost:
$3,700
- - - - - - - - $11,260 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$11,260
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$894
Cost:
$45
$631 10,258 $263 3 - - - - - - $631
10,258
kWh
$263
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$752
Cost:
$40
$577 9,379 $175 2 - - - - - - $577
9,379
kWh
$175
2
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,772
Cost:
$5,673
$2,721 44,256 $1,051 12 - - - - - - $2,721
44,256
kWh
$1,051
12
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$60,000
Cost:
-
- - - - - - $60,000 60 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$60,000
60
lb
-
-
$
06: 3.7214 REDUCE OR ELIMINATE WASTE Savings:
$493
Cost:
$192
- - - - $493 20 - - - - -
-
kWh
-
-
kW-months/year
$493
20
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$77,171
Cost:
$9,650
$3,929 63,893 $1,489 17 $493 20 $60,000 60 $11,260 - $3,929
63,893
kWh
$1,489
17
kW-months/year
$493
20
gal
$60,000
60
lb
$11,260
-
$
TOTAL IMPLEMENTED Savings:
$16,678
Cost:
$9,458
$3,929 63,893 $1,489 17 - - - - $11,260 - $3,929
63,893
kWh
$1,489
17
kW-months/year
-
-
gal
-
-
lb
$11,260
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost