IAC Assessment: MO0235
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0235
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Portland Cement
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 134
Plant Area (Sq.Ft.) 218,000
Annual Production 1,300,000 Tons
Production Hrs. Annual 8,760
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $4,366,715 176,051,585 kWh $0.02
Electricity Demand $1,906,197 29,306 kW-months/year $65.04
Electricity Fees $5,934 - $ -
Natural Gas $628,261 218,435 MMBtu $2.88
TOTAL ENERGY COSTS $6,907,107
RECOMMENDED SAVINGS* $3,847,053 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,539
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ lb $ $ $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$1,364
Cost:
$3,550
- - - - - - - - $1,364 - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
$1,364
-
$
02: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$2,950,000
Cost:
$19,000,000
- - - - - - $2,950,000 - - - -
-
kWh
-
-
kW-months/year
-
-
lb
$2,950,000
-
$
-
-
$
03: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$4,256
Cost:
$7,500
$4,256 183,177 - - - - - - - - $4,256
183,177
kWh
-
-
kW-months/year
-
-
lb
-
-
$
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$7,919
Cost:
$17,073
$6,163 265,240 $1,756 27 - - - - - - $6,163
265,240
kWh
$1,756
27
kW-months/year
-
-
lb
-
-
$
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$7,514
Cost:
$2,827
$5,693 245,018 $1,821 28 - - - - - - $5,693
245,018
kWh
$1,821
28
kW-months/year
-
-
lb
-
-
$
-
-
$
06: 3.5216 RECYCLE NONFERROUS DUST Savings:
$876,000
Cost:
$900,000
- - - - $876,000 146,000 - - - - -
-
kWh
-
-
kW-months/year
$876,000
146,000
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$3,847,053
Cost:
$19,930,950
$16,112 693,435 $3,577 55 $876,000 146,000 $2,950,000 - $1,364 - $16,112
693,435
kWh
$3,577
55
kW-months/year
$876,000
146,000
lb
$2,950,000
-
$
$1,364
-
$
TOTAL IMPLEMENTED Savings:
$13,539
Cost:
$28,123
$10,419 448,417 $1,756 27 - - - - $1,364 - $10,419
448,417
kWh
$1,756
27
kW-months/year
-
-
lb
-
-
$
$1,364
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $ $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Ancillary Material Cost