IAC logo
IAC Assessment: MO0245
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0245
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1998
Principal Product Low Volatage Aluminum Electrical Cable
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $100,000,000-$500,000,000
# of Employees 245
Plant Area (Sq.Ft.) 237,450
Annual Production 45,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $558,678 16,221,571 kWh $0.03
Electricity Demand $115,640 2,743 kW-months/year $42.16
Electricity Fees $33,786 - $ -
Natural Gas $189,057 51,180 MMBtu $3.69
TOTAL ENERGY COSTS $921,711
RECOMMENDED SAVINGS* $74,031 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $48,620
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 4.6110 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$21,816
Cost:
$9,450
- - - - - - - - $21,816 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$21,816
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,742
Cost:
$77
$3,278 88,804 $464 11 - - - - - - $3,278
88,804
kWh
$464
11
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,685
Cost:
$40
$2,348 63,599 $337 8 - - - - - - $2,348
63,599
kWh
$337
8
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$21,238
Cost:
$33,352
$18,708 506,741 $2,530 60 - - - - - - $18,708
506,741
kWh
$2,530
60
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$23,640
Cost:
-
- - - - - - $23,640 394 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$23,640
394
lb
-
-
$
06: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$910
Cost:
$1,000
- - - - $910 2 - - - - -
-
kWh
-
-
kW-months/year
$910
2
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$74,031
Cost:
$43,919
$24,334 659,144 $3,331 79 $910 2 $23,640 394 $21,816 - $24,334
659,144
kWh
$3,331
79
kW-months/year
$910
2
gal
$23,640
394
lb
$21,816
-
$
TOTAL IMPLEMENTED Savings:
$48,620
Cost:
$33,429
$21,986 595,545 $2,994 71 - - $23,640 394 - - $21,986
595,545
kWh
$2,994
71
kW-months/year
-
-
gal
$23,640
394
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost