IAC Assessment: MO0254
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0254
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Women's Clothing
NAICS n/a
SIC 2335 - Women's, Misses', and Juniors' Dresses
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 110,000
Annual Production 40,000 Pieces
Production Hrs. Annual 2,366
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $52,884 1,558,031 kWh $0.03
Electricity Demand $50,015 587 kW-months/year $85.20
Electricity Fees $23,154 - $ -
TOTAL ENERGY COSTS $135,154
RECOMMENDED SAVINGS* $31,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$8,319
Cost:
$24,516
$4,828 95,545 $3,491 41 - - - - - - $4,828
95,545
kWh
$3,491
41
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,096
Cost:
$991
$1,244 24,619 $852 10 - - - - - - $1,244
24,619
kWh
$852
10
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$13,160
Cost:
$26,000
$14,810 293,083 $5,850 150 $(-7,500) 1,250 - - - - $14,810
293,083
kWh
$5,850
150
kW-months/year
$(-7,500)
1,250
MMBtu
-
-
lb
-
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$5,290
Cost:
-
- - - - - - $5,290 46 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,290
46
lb
-
-
$
05: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL Savings:
$1,320
Cost:
$3,300
- - - - - - $1,320 220 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,320
220
lb
-
-
$
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$378
Cost:
$624
- - - - - - - - $378 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$378
-
$
07: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$535
Cost:
$3,800
- - - - - - - - $535 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$535
-
$
TOTAL RECOMMENDED Savings:
$31,098
Cost:
$59,231
$20,882 413,247 $10,193 201 $(-7,500) 1,250 $6,610 266 $913 - $20,882
413,247
kWh
$10,193
201
kW-months/year
$(-7,500)
1,250
MMBtu
$6,610
266
lb
$913
-
$
TOTAL IMPLEMENTED Savings:
$24,110
Cost:
$55,307
$20,882 413,247 $10,193 201 $(-7,500) 1,250 - - $535 - $20,882
413,247
kWh
$10,193
201
kW-months/year
$(-7,500)
1,250
MMBtu
-
-
lb
$535
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes