IAC logo
IAC Assessment: MO0264
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0264
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Mobile Air Storage Tanks
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 40
Plant Area (Sq.Ft.) 90,000
Annual Production 124,800 Units
Production Hrs. Annual 3,120
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,677 820,926 kWh $0.04
Electricity Demand $14,900 262 kW-months/year $56.87
Electricity Fees $5,447 - $ -
LPG $30,071 7,453 MMBtu $4.03
TOTAL ENERGY COSTS $84,541
RECOMMENDED SAVINGS* $19,550 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,509
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,289
Cost:
$62
$902 21,102 $387 7 - - - - - - $902
21,102
kWh
$387
7
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,752
Cost:
$40
$1,229 28,722 $523 9 - - - - - - $1,229
28,722
kWh
$523
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$949
Cost:
$1,518
$665 15,533 $284 5 - - - - - - $665
15,533
kWh
$284
5
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$960
Cost:
$300
- - - - $960 238 - - - - -
-
kWh
-
-
kW-months/year
$960
238
MMBtu
-
-
lb
-
-
$
05: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,600
Cost:
-
- - - - - - $2,600 1,300 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,600
1,300
lb
-
-
$
06: 4.4320 CROSS-TRAIN PERSONNEL TO AVOID LOST TIME Savings:
$8,000
Cost:
$2,000
- - - - - - - - $8,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,000
-
$
07: 4.4210 MODIFY CURRENT INCENTIVE PROGRAM Savings:
$4,000
Cost:
$700
- - - - - - - - $4,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,000
-
$
TOTAL RECOMMENDED Savings:
$19,550
Cost:
$4,620
$2,796 65,357 $1,194 21 $960 238 $2,600 1,300 $12,000 - $2,796
65,357
kWh
$1,194
21
kW-months/year
$960
238
MMBtu
$2,600
1,300
lb
$12,000
-
$
TOTAL IMPLEMENTED Savings:
$4,509
Cost:
$1,818
$665 15,533 $284 5 $960 238 $2,600 1,300 - - $665
15,533
kWh
$284
5
kW-months/year
$960
238
MMBtu
$2,600
1,300
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand LPG Solid Waste (non-haz) Personnel Changes