IAC logo
IAC Assessment: MO0269
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0269
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 1999
Principal Product Plastic Injection Molding
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 265
Plant Area (Sq.Ft.) 250,000
Annual Production 400,000,000 Pieces
Production Hrs. Annual 8,568
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $376,023 8,780,774 kWh $0.04
Electricity Demand $29,022 1,674 kW-months/year $17.34
Electricity Fees $51,507 - $ -
Natural Gas $17,103 3,440 MMBtu $4.97
TOTAL ENERGY COSTS $513,191
RECOMMENDED SAVINGS* $968,139 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$22,189
Cost:
$4,604
$22,189 452,814 - - - - - - - - $22,189
452,814
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$8,727
Cost:
$22,000
$14,350 293,083 $590 34 $(-6,213) (-1,250) - - - - $14,350
293,083
kWh
$590
34
kW-months/year
$(-6,213)
(-1,250)
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,256
Cost:
$7,330
$3,875 79,132 $381 22 - - - - - - $3,875
79,132
kWh
$381
22
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$681
Cost:
$80
$646 13,189 $35 2 - - - - - - $646
13,189
kWh
$35
2
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$21,492
Cost:
-
- - - - - - $21,492 30,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$21,492
30,000
lb
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$6,800
Cost:
-
- - - - - - $6,800 6,800 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,800
6,800
lb
-
-
$
07: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$539,784
Cost:
$10,944
- - - - - - - - $539,784 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$539,784
-
$
08: 4.5140 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS Savings:
$359,856
Cost:
$10,944
- - - - - - - - $359,856 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$359,856
-
$
09: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$4,354
Cost:
$157
- - - - - - - - $4,354 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,354
-
$
TOTAL RECOMMENDED Savings:
$968,139
Cost:
$56,059
$41,060 838,218 $1,006 58 $(-6,213) (-1,250) $28,292 36,800 $903,994 - $41,060
838,218
kWh
$1,006
58
kW-months/year
$(-6,213)
(-1,250)
MMBtu
$28,292
36,800
lb
$903,994
-
$
TOTAL IMPLEMENTED Savings:
$38,280
Cost:
$12,171
$26,710 545,135 $416 24 - - $6,800 6,800 $4,354 - $26,710
545,135
kWh
$416
24
kW-months/year
-
-
MMBtu
$6,800
6,800
lb
$4,354
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes