Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 1999 |
Principal Product | Plastic Injection Molding |
NAICS | n/a |
SIC | 3089 - Plastics Products, Nec |
Sales | $10,000,000-$50,000,000 |
# of Employees | 265 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 400,000,000 Pieces |
Production Hrs. Annual | 8,568 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $376,023 | 8,780,774 | kWh | $0.04 |
Electricity Demand | $29,022 | 1,674 | kW-months/year | $17.34 |
Electricity Fees | $51,507 | - | $ | - |
Natural Gas | $17,103 | 3,440 | MMBtu | $4.97 |
TOTAL ENERGY COSTS | $513,191 | |||
RECOMMENDED SAVINGS* | $968,139 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $38,280 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $22,189 Cost: $4,604 |
$22,189 | 452,814 | - | - | - | - | - | - | - | - |
$22,189 452,814 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $8,727 Cost: $22,000 |
$14,350 | 293,083 | $590 | 34 | $(-6,213) | (-1,250) | - | - | - | - |
$14,350 293,083 kWh |
$590 34 kW-months/year |
$(-6,213) (-1,250) MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,256 Cost: $7,330 |
$3,875 | 79,132 | $381 | 22 | - | - | - | - | - | - |
$3,875 79,132 kWh |
$381 22 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $681 Cost: $80 |
$646 | 13,189 | $35 | 2 | - | - | - | - | - | - |
$646 13,189 kWh |
$35 2 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $21,492 Cost: - |
- | - | - | - | - | - | $21,492 | 30,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$21,492 30,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY |
Savings: $6,800 Cost: - |
- | - | - | - | - | - | $6,800 | 6,800 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,800 6,800 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $539,784 Cost: $10,944 |
- | - | - | - | - | - | - | - | $539,784 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$539,784 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.514 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS |
Savings: $359,856 Cost: $10,944 |
- | - | - | - | - | - | - | - | $359,856 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$359,856 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $4,354 Cost: $157 |
- | - | - | - | - | - | - | - | $4,354 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$4,354 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $968,139 Cost: $56,059 |
$41,060 | 838,218 | $1,006 | 58 | $(-6,213) | (-1,250) | $28,292 | 36,800 | $903,994 | - | $41,060 838,218 kWh |
$1,006 58 kW-months/year |
$(-6,213) (-1,250) MMBtu |
$28,292 36,800 lb |
$903,994 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $38,280 Cost: $12,171 |
$26,710 | 545,135 | $416 | 24 | - | - | $6,800 | 6,800 | $4,354 | - | $26,710 545,135 kWh |
$416 24 kW-months/year |
- - MMBtu |
$6,800 6,800 lb |
$4,354 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |