Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Missouri, Rolla |
---|---|
Assessment Year | 2000 |
Principal Product | Modular Homes |
NAICS | n/a |
SIC | 2452 - Prefabricated Wood Buildings |
Sales | $10,000,000-$50,000,000 |
# of Employees | 260 |
Plant Area (Sq.Ft.) | 149,000 |
Annual Production | 1,500 Pieces |
Production Hrs. Annual | 2,080 |
Location (State) | MO |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $58,204 | 1,109,906 | kWh | $0.05 |
Electricity Demand | $8,878 | 433 | kW-months/year | $20.50 |
Electricity Fees | $9,571 | - | $ | - |
Natural Gas | $46,550 | 7,363 | MMBtu | $6.32 |
TOTAL ENERGY COSTS | $155,436 | |||
RECOMMENDED SAVINGS* | $86,805 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $55,473 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,489 Cost: $4,387 |
$1,282 | 21,102 | $207 | 10 | - | - | - | - |
$1,282 21,102 kWh |
$207 10 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $612 Cost: $351 |
$526 | 8,499 | $86 | 4 | - | - | - | - |
$526 8,499 kWh |
$86 4 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,007 Cost: $160 |
$866 | 14,068 | $141 | 7 | - | - | - | - |
$866 14,068 kWh |
$141 7 kW-months/year |
- - lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $30,325 Cost: - |
- | - | - | - | $30,325 | 85 | - | - |
- - kWh |
- - kW-months/year |
$30,325 85 lb |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT |
Savings: $26,686 Cost: $5,053 |
- | - | - | - | - | - | $26,686 | - |
- - kWh |
- - kW-months/year |
- - lb |
$26,686 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.424 IMPROVE SPACE COMFORT CONDITIONING |
Savings: $26,686 Cost: $702 |
- | - | - | - | - | - | $26,686 | - |
- - kWh |
- - kW-months/year |
- - lb |
$26,686 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $86,805 Cost: $10,653 |
$2,674 | 43,669 | $434 | 21 | $30,325 | 85 | $53,372 | - | $2,674 43,669 kWh |
$434 21 kW-months/year |
$30,325 85 lb |
$53,372 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $55,473 Cost: $10,493 |
$1,808 | 29,601 | $293 | 14 | - | - | $53,372 | - | $1,808 29,601 kWh |
$293 14 kW-months/year |
- - lb |
$53,372 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Solid Waste (non-haz) | Personnel Changes |