IAC logo
IAC Assessment: MO0276
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MO0276
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Missouri, Rolla
Assessment Year 2000
Principal Product Chairs and Tables
NAICS n/a
SIC 2499 - Wood Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 127
Plant Area (Sq.Ft.) 72,400
Annual Production 72,800 Pieces
Production Hrs. Annual 2,080
Location (State) MO
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $29,512 894,490 kWh $0.03
Electricity Demand $27,602 441 kW-months/year $62.59
Electricity Fees $3,695 - $ -
LPG $11,834 2,002 MMBtu $5.91
TOTAL ENERGY COSTS $78,947
RECOMMENDED SAVINGS* $12,422 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,165
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ gal $ lb $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,643
Cost:
$3,595
$892 24,033 $751 12 - - - - - - $892
24,033
kWh
$751
12
kW-months/year
-
-
gal
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$544
Cost:
$263
$294 7,913 $250 4 - - - - - - $294
7,913
kWh
$250
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$533
Cost:
$40
$283 7,620 $250 4 - - - - - - $283
7,620
kWh
$250
4
kW-months/year
-
-
gal
-
-
lb
-
-
$
04: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$161
Cost:
$160
$98 2,638 $63 1 - - - - - - $98
2,638
kWh
$63
1
kW-months/year
-
-
gal
-
-
lb
-
-
$
05: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$460
Cost:
-
$272 7,327 $188 3 - - - - - - $272
7,327
kWh
$188
3
kW-months/year
-
-
gal
-
-
lb
-
-
$
06: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$1,194
Cost:
$2,160
- - - - - - $1,194 144 - - -
-
kWh
-
-
kW-months/year
-
-
gal
$1,194
144
lb
-
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$3,363
Cost:
$3,500
- - - - $3,363 1,320 - - - - -
-
kWh
-
-
kW-months/year
$3,363
1,320
gal
-
-
lb
-
-
$
08: 4.111 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$4,524
Cost:
$1,714
- - - - - - - - $4,524 - -
-
kWh
-
-
kW-months/year
-
-
gal
-
-
lb
$4,524
-
$
TOTAL RECOMMENDED Savings:
$12,422
Cost:
$11,432
$1,839 49,531 $1,502 24 $3,363 1,320 $1,194 144 $4,524 - $1,839
49,531
kWh
$1,502
24
kW-months/year
$3,363
1,320
gal
$1,194
144
lb
$4,524
-
$
TOTAL IMPLEMENTED Savings:
$1,165
Cost:
$423
$664 17,878 $501 8 - - - - - - $664
17,878
kWh
$501
8
kW-months/year
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ gal $ lb $ $
Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Other Liquid (non-haz) Solid Waste (non-haz) Ancillary Material Cost