Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1995
Principal Product air bags
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 217
Plant Area (Sq.Ft.) 100,000
Annual Production 1,200,000 Pieces
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $138,439 2,894,783 kWh $0.05
Natural Gas $6,967 1,708 MMBtu $4.08
TOTAL ENERGY COSTS $145,406
RECOMMENDED SAVINGS* $13,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,413
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)
$ kWh $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,709
Cost:
$3,855
$3,709 50,703 - - - - $3,709
50,703
kWh
-
-
MMBtu
-
-
lb
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$579
Cost:
$1,200
- - $579 99 - - -
-
kWh
$579
99
MMBtu
-
-
lb
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,047
Cost:
$200
$5,047 68,875 - - - - $5,047
68,875
kWh
-
-
MMBtu
-
-
lb
04: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY Savings:
$1,870
Cost:
$5,100
$1,870 25,791 - - - - $1,870
25,791
kWh
-
-
MMBtu
-
-
lb
05: 3.7196 USE RE-USABLE FILTERS Savings:
$1,400
Cost:
$420
- - - - $1,400 - -
-
kWh
-
-
MMBtu
$1,400
-
lb
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$957
Cost:
$800
$1,082 6,741 $(-125) (-23) - - $1,082
6,741
kWh
$(-125)
(-23)
MMBtu
-
-
lb
07: 2.6214 SHUT OFF PILOTS IN STANDBY EQUIPMENT Savings:
$125
Cost:
$20
- - $125 25 - - -
-
kWh
$125
25
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$13,687
Cost:
$11,595
$11,708 152,110 $579 101 $1,400 - $11,708
152,110
kWh
$579
101
MMBtu
$1,400
-
lb
TOTAL IMPLEMENTED Savings:
$4,413
Cost:
$5,075
$3,709 50,703 $704 124 - - $3,709
50,703
kWh
$704
124
MMBtu
-
-
lb
Savings
Cost
$ kWh $ MMBtu $ lb
Electricity Usage Natural Gas Solid Waste (non-haz) Electricity Usage Natural Gas Solid Waste (non-haz)