IAC logo
IAC Assessment: MS0044
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0044
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1995
Principal Product Furniture
NAICS n/a
SIC 2521 - Wood Office Furniture
Sales $10,000,000-$50,000,000
# of Employees 344
Plant Area (Sq.Ft.) 280,000
Annual Production 150,000 Pieces
Production Hrs. Annual 2,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $124,135 2,080,012 kWh $0.06
Natural Gas $9,205 1,683 MMBtu $5.47
TOTAL ENERGY COSTS $133,340
RECOMMENDED SAVINGS* $28,389 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,849
Cost:
$200
$1,849 21,688 - - - - $1,849
21,688
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,785
Cost:
-
- - - - $5,785 - -
-
kWh
-
-
MMBtu
$5,785
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$593
Cost:
$2,820
- - $593 104 - - -
-
kWh
$593
104
MMBtu
-
-
$
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$11,011
Cost:
$10,635
$6,211 204,865 - - $4,800 - $6,211
204,865
kWh
-
-
MMBtu
$4,800
-
$
05: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY Savings:
$7,392
Cost:
$7,500
$1,392 24,326 - - $6,000 - $1,392
24,326
kWh
-
-
MMBtu
$6,000
-
$
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$989
Cost:
$760
$1,443 12,603 $(-454) (-47) - - $1,443
12,603
kWh
$(-454)
(-47)
MMBtu
-
-
$
07: 2.7314 REDUCE VENTILATION AIR Savings:
$536
Cost:
$200
$536 17,585 - - - - $536
17,585
kWh
-
-
MMBtu
-
-
$
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$234
Cost:
$202
$234 2,345 - - - - $234
2,345
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,389
Cost:
$22,317
$11,665 283,412 $139 57 $16,585 - $11,665
283,412
kWh
$139
57
MMBtu
$16,585
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes