Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1995 |
Principal Product | Furniture |
NAICS | n/a |
SIC | 2521 - Wood Office Furniture |
Sales | $10,000,000-$50,000,000 |
# of Employees | 344 |
Plant Area (Sq.Ft.) | 280,000 |
Annual Production | 150,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $124,135 | 2,080,012 | kWh | $0.06 |
Natural Gas | $9,205 | 1,683 | MMBtu | $5.47 |
TOTAL ENERGY COSTS | $133,340 | |||
RECOMMENDED SAVINGS* | $28,389 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $1,849 Cost: $200 |
$1,849 | 21,688 | - | - | - | - |
$1,849 21,688 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,785 Cost: - |
- | - | - | - | $5,785 | - |
- - kWh |
- - MMBtu |
$5,785 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $593 Cost: $2,820 |
- | - | $593 | 104 | - | - |
- - kWh |
$593 104 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $11,011 Cost: $10,635 |
$6,211 | 204,865 | - | - | $4,800 | - |
$6,211 204,865 kWh |
- - MMBtu |
$4,800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7227 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY |
Savings: $7,392 Cost: $7,500 |
$1,392 | 24,326 | - | - | $6,000 | - |
$1,392 24,326 kWh |
- - MMBtu |
$6,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $989 Cost: $760 |
$1,443 | 12,603 | $(-454) | (-47) | - | - |
$1,443 12,603 kWh |
$(-454) (-47) MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7314 REDUCE VENTILATION AIR |
Savings: $536 Cost: $200 |
$536 | 17,585 | - | - | - | - |
$536 17,585 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $234 Cost: $202 |
$234 | 2,345 | - | - | - | - |
$234 2,345 kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $28,389 Cost: $22,317 |
$11,665 | 283,412 | $139 | 57 | $16,585 | - | $11,665 283,412 kWh |
$139 57 MMBtu |
$16,585 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Administrative Changes | Electricity Usage | Natural Gas | Administrative Changes |