IAC logo
IAC Assessment: MS0046
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0046
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Aluminum Die Castings
NAICS n/a
SIC 3363 - Aluminum Die-castings
Sales $10,000,000-$50,000,000
# of Employees 164
Plant Area (Sq.Ft.) 93,000
Annual Production 32,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,058 10,901,524 kWh $0.02
Electricity Demand $156,976 28,909 kW-months/year $5.43
Electricity Fees $183,347 - $ -
Natural Gas $421,181 174,793 MMBtu $2.41
TOTAL ENERGY COSTS $995,176
RECOMMENDED SAVINGS* $94,888 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ $ $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$645
Cost:
$1,502
$394 23,447 $251 - - - - - $394
23,447
kWh
$251
-
$
-
-
MMBtu
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$632
Cost:
$110
$386 23,154 $246 - - - - - $386
23,154
kWh
$246
-
$
-
-
MMBtu
-
-
lb
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$73,061
Cost:
$33,000
- - - - $73,061 30,445 - - -
-
kWh
-
-
$
$73,061
30,445
MMBtu
-
-
lb
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$20,040
Cost:
$31,500
- - - - - - $20,040 196,000 -
-
kWh
-
-
$
-
-
MMBtu
$20,040
196,000
lb
05: 3.5216 RECYCLE NONFERROUS DUST Savings:
$510
Cost:
-
- - - - - - $510 357,000 -
-
kWh
-
-
$
-
-
MMBtu
$510
357,000
lb
TOTAL RECOMMENDED Savings:
$94,888
Cost:
$66,112
$780 46,601 $497 - $73,061 30,445 $20,550 553,000 $780
46,601
kWh
$497
-
$
$73,061
30,445
MMBtu
$20,550
553,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ $ $ MMBtu $ lb
Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Fees Natural Gas Solid Waste (non-haz)