IAC logo
IAC Assessment: MS0050
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Defense Electronic Subsystems
NAICS n/a
SIC 3812 - Search And Navigation Equipment
Sales $100,000,000-$500,000,000
# of Employees 320
Plant Area (Sq.Ft.) 352,000
Annual Production 670 Pieces
Production Hrs. Annual 2,496
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $596,150 15,240,035 kWh $0.04
Electricity Demand $128,495 32,573 kW-months/year $3.94
Electricity Fees $(-36,239) - $ -
Natural Gas $54,079 13,373 MMBtu $4.04
TOTAL ENERGY COSTS $742,485
RECOMMENDED SAVINGS* $48,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $22,670
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$517
Cost:
$2,000
- - - - $517 129 - - -
-
kWh
-
-
kW-months/year
$517
129
MMBtu
-
-
lb
02: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$7,370
Cost:
$1,882
$5,227 155,627 $4,284 504 $(-2,141) (-531) - - $5,227
155,627
kWh
$4,284
504
kW-months/year
$(-2,141)
(-531)
MMBtu
-
-
lb
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$14,049
Cost:
$1,940
$8,607 256,155 $5,442 1,280 - - - - $8,607
256,155
kWh
$5,442
1,280
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$15,300
Cost:
-
- - $15,300 3,600 - - - - -
-
kWh
$15,300
3,600
kW-months/year
-
-
MMBtu
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$11,500
Cost:
$6,500
- - - - - - $11,500 200,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$11,500
200,000
lb
TOTAL RECOMMENDED Savings:
$48,736
Cost:
$12,322
$13,834 411,782 $25,026 5,384 $(-1,624) (-402) $11,500 200,000 $13,834
411,782
kWh
$25,026
5,384
kW-months/year
$(-1,624)
(-402)
MMBtu
$11,500
200,000
lb
TOTAL IMPLEMENTED Savings:
$22,670
Cost:
$1,882
$5,227 155,627 $19,584 4,104 $(-2,141) (-531) - - $5,227
155,627
kWh
$19,584
4,104
kW-months/year
$(-2,141)
(-531)
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)