IAC logo
IAC Assessment: MS0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product carboard containers
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $10,000,000-$50,000,000
# of Employees 111
Plant Area (Sq.Ft.) 160,000
Annual Production 442,000 Thousand Feet
Production Hrs. Annual 4,160
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $118,506 2,392,438 kWh $0.05
Electricity Demand $20,290 7,386 kW-months/year $2.75
Electricity Fees $35,931 - $ -
Natural Gas $62,261 24,979 MMBtu $2.49
TOTAL ENERGY COSTS $146,312
RECOMMENDED SAVINGS* $12,914 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,192
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,291
Cost:
$891
$925 19,343 $140 56 $226 - - - - - $925
19,343
kWh
$140
56
kW-months/year
$226
-
$
-
-
MMBtu
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$180
Cost:
$644
$111 2,345 $34 14 $35 - - - - - $111
2,345
kWh
$34
14
kW-months/year
$35
-
$
-
-
MMBtu
-
-
Tgal
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,901
Cost:
$1,000
- - - - - - $2,901 1,165 - - -
-
kWh
-
-
kW-months/year
-
-
$
$2,901
1,165
MMBtu
-
-
Tgal
04: 3.4113 TREAT AND REUSE RINSE WATERS Savings:
$8,542
Cost:
$36,987
$(-71) (-1,465) $(-5) (-2) - - - - $8,618 529,695 $(-71)
(-1,465)
kWh
$(-5)
(-2)
kW-months/year
-
-
$
-
-
MMBtu
$8,618
529,695
Tgal
TOTAL RECOMMENDED Savings:
$12,914
Cost:
$39,522
$965 20,223 $169 68 $261 - $2,901 1,165 $8,618 529,695 $965
20,223
kWh
$169
68
kW-months/year
$261
-
$
$2,901
1,165
MMBtu
$8,618
529,695
Tgal
TOTAL IMPLEMENTED Savings:
$4,192
Cost:
$1,891
$925 19,343 $140 56 $226 - $2,901 1,165 - - $925
19,343
kWh
$140
56
kW-months/year
$226
-
$
$2,901
1,165
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal