IAC Assessment: MS0053
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0053
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product automotive service equipment
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 110,000
Annual Production 4,000,000 Pounds
Production Hrs. Annual 2,295
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $148,734 3,047,773 kWh $0.05
Electricity Demand $29,899 11,153 kW-months/year $2.68
Electricity Fees $39,466 - $ -
Natural Gas $48,680 11,858 MMBtu $4.11
TOTAL ENERGY COSTS $252,709
RECOMMENDED SAVINGS* $32,625 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,529
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,882
Cost:
$3,720
$4,163 87,339 - - $719 - - - - - $4,163
87,339
kWh
-
-
kW-months/year
$719
-
$
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,647
Cost:
$12,854
$3,569 74,736 $989 394 $1,089 - - - - - $3,569
74,736
kWh
$989
394
kW-months/year
$1,089
-
$
-
-
MMBtu
-
-
lb
03: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$1,040
Cost:
-
$559 11,723 $261 104 $220 - - - - - $559
11,723
kWh
$261
104
kW-months/year
$220
-
$
-
-
MMBtu
-
-
lb
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$780
Cost:
$1,800
- - - - - - $780 190 - - -
-
kWh
-
-
kW-months/year
-
-
$
$780
190
MMBtu
-
-
lb
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$5,526
Cost:
$3,350
- - - - - - $5,526 1,346 - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,526
1,346
MMBtu
-
-
lb
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$14,750
Cost:
$31,500
- - - - - - - - $14,750 150,000 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$14,750
150,000
lb
TOTAL RECOMMENDED Savings:
$32,625
Cost:
$53,224
$8,291 173,798 $1,250 498 $2,028 - $6,306 1,536 $14,750 150,000 $8,291
173,798
kWh
$1,250
498
kW-months/year
$2,028
-
$
$6,306
1,536
MMBtu
$14,750
150,000
lb
TOTAL IMPLEMENTED Savings:
$10,529
Cost:
$16,574
$7,732 162,075 $989 394 $1,808 - - - - - $7,732
162,075
kWh
$989
394
kW-months/year
$1,808
-
$
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz)