IAC logo
IAC Assessment: MS0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product periodicals
NAICS n/a
SIC 2721 - Periodicals
Sales $10,000,000-$50,000,000
# of Employees 425
Plant Area (Sq.Ft.) 140,000
Annual Production 55,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $483,612 10,932,005 kWh $0.04
Electricity Demand $71,178 23,803 kW-months/year $2.99
Electricity Fees $114,450 - $ -
Natural Gas $54,007 18,276 MMBtu $2.96
TOTAL ENERGY COSTS $90,011
RECOMMENDED SAVINGS* $30,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ lb $ $
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,932
Cost:
$2,552
$4,725 137,456 - - $207 - - - - - $4,725
137,456
kWh
-
-
kW-months/year
$207
-
$
-
-
lb
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,026
Cost:
$1,624
$4,816 140,094 - - $210 - - - - - $4,816
140,094
kWh
-
-
kW-months/year
$210
-
$
-
-
lb
-
-
$
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$3,493
Cost:
$410
$2,699 78,546 $458 151 $336 - - - - - $2,699
78,546
kWh
$458
151
kW-months/year
$336
-
$
-
-
lb
-
-
$
04: 2.7314 REDUCE VENTILATION AIR Savings:
$11,167
Cost:
$3,016
$7,990 232,415 $1,912 631 $1,265 - - - - - $7,990
232,415
kWh
$1,912
631
kW-months/year
$1,265
-
$
-
-
lb
-
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,219
Cost:
$288
$872 25,498 $209 69 $138 - - - - - $872
25,498
kWh
$209
69
kW-months/year
$138
-
$
-
-
lb
-
-
$
06: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$507
Cost:
$261
$362 10,551 $88 29 $57 - - - - - $362
10,551
kWh
$88
29
kW-months/year
$57
-
$
-
-
lb
-
-
$
07: 3.7196 USE RE-USABLE FILTERS Savings:
$4,251
Cost:
$5,190
- - - - - - $3 227 $4,248 - -
-
kWh
-
-
kW-months/year
-
-
$
$3
227
lb
$4,248
-
$
TOTAL RECOMMENDED Savings:
$30,595
Cost:
$13,341
$21,464 624,560 $2,667 880 $2,213 - $3 227 $4,248 - $21,464
624,560
kWh
$2,667
880
kW-months/year
$2,213
-
$
$3
227
lb
$4,248
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Ancillary Material Cost