IAC logo
IAC Assessment: MS0064
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0064
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Metal Hardware
NAICS n/a
SIC 3429 - Hardware, Nec
Sales $50,000,000-$100,000,000
# of Employees 264
Plant Area (Sq.Ft.) 281,500
Annual Production 10,240,000 Pounds
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $150,430 3,539,566 kWh $0.04
Electricity Demand $62,785 10,502 kW-months/year $5.98
Electricity Fees $14,335 - $ -
Natural Gas $140,470 35,189 MMBtu $3.99
TOTAL ENERGY COSTS $368,767
RECOMMENDED SAVINGS* $38,486 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $25,251
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7134 USE PHOTOCELL CONTROLS Savings:
$7,748
Cost:
$1,675
$7,748 182,298 - - - - - - - - $7,748
182,298
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,252
Cost:
$7,353
- - - - $12,252 3,003 - - - - -
-
kWh
-
-
kW-months/year
$12,252
3,003
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$12,999
Cost:
$35,867
$8,337 198,417 $4,662 777 - - - - - - $8,337
198,417
kWh
$4,662
777
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,386
Cost:
$3,248
$1,386 32,532 - - - - - - - - $1,386
32,532
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,928
Cost:
$320
$1,928 45,428 - - - - - - - - $1,928
45,428
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$800
Cost:
$1,000
- - - - - - $800 2,840 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$800
2,840
lb
-
-
$
07: 3.7196 USE RE-USABLE FILTERS Savings:
$1,373
Cost:
$1,440
- - - - - - - 100 $1,373 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
100
lb
$1,373
-
$
TOTAL RECOMMENDED Savings:
$38,486
Cost:
$50,903
$19,399 458,675 $4,662 777 $12,252 3,003 $800 2,940 $1,373 - $19,399
458,675
kWh
$4,662
777
kW-months/year
$12,252
3,003
MMBtu
$800
2,940
lb
$1,373
-
$
TOTAL IMPLEMENTED Savings:
$25,251
Cost:
$43,220
$8,337 198,417 $4,662 777 $12,252 3,003 - - - - $8,337
198,417
kWh
$4,662
777
kW-months/year
$12,252
3,003
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes