IAC logo
IAC Assessment: MS0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Steel Containers
NAICS n/a
SIC 3412 - Metal Barrels, Drums, And Pails
Sales $5,000,000-$10,000,000
# of Employees 75
Plant Area (Sq.Ft.) 150,000
Annual Production 944,000 Pieces
Production Hrs. Annual 2,600
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,960 2,555,686 kWh $0.05
Electricity Demand $23,990 8,939 kW-months/year $2.68
Electricity Fees $3,994 - $ -
Natural Gas $117,641 31,460 MMBtu $3.74
TOTAL ENERGY COSTS $322,888
RECOMMENDED SAVINGS* $70,243 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,812
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,503
Cost:
$11,651
$2,925 55,979 $578 261 - - - - - - $2,925
55,979
kWh
$578
261
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$2,812
Cost:
$610
$2,351 44,842 $461 153 - - - - - - $2,351
44,842
kWh
$461
153
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$44,129
Cost:
$12,825
- - - - $44,129 14,147 - - - - -
-
kWh
-
-
kW-months/year
$44,129
14,147
MMBtu
-
-
gal
-
-
$
04: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$19,799
Cost:
$15,000
$(-782) (-12,603) - - - - $21,601 12,204 $(-1,020) - $(-782)
(-12,603)
kWh
-
-
kW-months/year
-
-
MMBtu
$21,601
12,204
gal
$(-1,020)
-
$
TOTAL RECOMMENDED Savings:
$70,243
Cost:
$40,086
$4,494 88,218 $1,039 414 $44,129 14,147 $21,601 12,204 $(-1,020) - $4,494
88,218
kWh
$1,039
414
kW-months/year
$44,129
14,147
MMBtu
$21,601
12,204
gal
$(-1,020)
-
$
TOTAL IMPLEMENTED Savings:
$2,812
Cost:
$610
$2,351 44,842 $461 153 - - - - - - $2,351
44,842
kWh
$461
153
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes