IAC logo
IAC Assessment: MS0069
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0069
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Ductile Iron Castings
NAICS n/a
SIC 3321 - Gray And Ductile Iron Foundries
Sales $1,000,000-$5,000,000
# of Employees 69
Plant Area (Sq.Ft.) 36,000
Annual Production 4,507,114 Pounds
Production Hrs. Annual 4,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,070 5,330,305 kWh $0.04
Electricity Fees $72,698 - $ -
Natural Gas $54,850 10,257 MMBtu $5.35
TOTAL ENERGY COSTS $362,978
RECOMMENDED SAVINGS* $100,925 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Fees Natural Gas Primary Product
$ kWh $ $ $ MMBtu $ $
01: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,743
Cost:
$300
$1,284 30,188 $459 - - - - - $1,284
30,188
kWh
$459
-
$
-
-
MMBtu
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,677
Cost:
$2,740
- - - - $2,677 505 - - -
-
kWh
-
-
$
$2,677
505
MMBtu
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,360
Cost:
$7,226
$3,196 85,873 $1,164 - - - - - $3,196
85,873
kWh
$1,164
-
$
-
-
MMBtu
-
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,012
Cost:
$925
$767 18,171 $245 - - - - - $767
18,171
kWh
$245
-
$
-
-
MMBtu
-
-
$
05: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$81,053
Cost:
-
- - $81,053 - - - - - -
-
kWh
$81,053
-
$
-
-
MMBtu
-
-
$
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$10,080
Cost:
$640
- - - - - - $10,080 - -
-
kWh
-
-
$
-
-
MMBtu
$10,080
-
$
TOTAL RECOMMENDED Savings:
$100,925
Cost:
$11,831
$5,247 134,232 $82,921 - $2,677 505 $10,080 - $5,247
134,232
kWh
$82,921
-
$
$2,677
505
MMBtu
$10,080
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Primary Product Electricity Usage Electricity Fees Natural Gas Primary Product