Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1996 |
Principal Product | Wood Working Equipment |
NAICS | n/a |
SIC | 3541 - Machine Tools, Metal Cutting Types |
Sales | $50,000,000-$100,000,000 |
# of Employees | 290 |
Plant Area (Sq.Ft.) | 330,000 |
Annual Production | 61,000,000 Pounds |
Production Hrs. Annual | 4,150 |
Location (State) | MS |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $318,723 | 10,307,738 | kWh | $0.03 |
Electricity Demand | $225,625 | 26,226 | kW-months/year | $8.60 |
Electricity Fees | $8,795 | - | $ | - |
Natural Gas | $84,143 | 24,674 | MMBtu | $3.41 |
TOTAL ENERGY COSTS | $536,079 | |||
RECOMMENDED SAVINGS* | $60,107 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $43,335 Cost: $94,398 |
$20,694 | 669,402 | $22,641 | 2,488 | - | - | - | - | - | - | - | - |
$20,694 669,402 kWh |
$22,641 2,488 kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,676 Cost: $5,365 |
- | - | - | - | $4,676 | 1,375 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,676 1,375 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $3,115 Cost: $3,350 |
- | - | - | - | $3,115 | 916 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,115 916 MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS |
Savings: $1,733 Cost: $1,624 |
$1,733 | 55,979 | - | - | - | - | - | - | - | - | - | - |
$1,733 55,979 kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $7,248 Cost: - |
- | - | - | - | - | - | $10,082 | 430 | $(-2,881) | - | $47 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$10,082 430 gal |
$(-2,881) - $ |
$47 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $60,107 Cost: $104,737 |
$22,427 | 725,381 | $22,641 | 2,488 | $7,791 | 2,291 | $10,082 | 430 | $(-2,881) | - | $47 | - | $22,427 725,381 kWh |
$22,641 2,488 kW-months/year |
$7,791 2,291 MMBtu |
$10,082 430 gal |
$(-2,881) - $ |
$47 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - gal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | gal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Other Liquid (haz) | Personnel Changes | Ancillary Material Cost |