IAC Assessment: MS0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1996
Principal Product Wood Working Equipment
NAICS n/a
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $50,000,000-$100,000,000
# of Employees 290
Plant Area (Sq.Ft.) 330,000
Annual Production 61,000,000 Pounds
Production Hrs. Annual 4,150
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $318,723 10,307,738 kWh $0.03
Electricity Demand $225,625 26,226 kW-months/year $8.60
Electricity Fees $8,795 - $ -
Natural Gas $84,143 24,674 MMBtu $3.41
TOTAL ENERGY COSTS $536,079
RECOMMENDED SAVINGS* $60,107 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$43,335
Cost:
$94,398
$20,694 669,402 $22,641 2,488 - - - - - - - - $20,694
669,402
kWh
$22,641
2,488
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,676
Cost:
$5,365
- - - - $4,676 1,375 - - - - - - -
-
kWh
-
-
kW-months/year
$4,676
1,375
MMBtu
-
-
gal
-
-
$
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$3,115
Cost:
$3,350
- - - - $3,115 916 - - - - - - -
-
kWh
-
-
kW-months/year
$3,115
916
MMBtu
-
-
gal
-
-
$
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,733
Cost:
$1,624
$1,733 55,979 - - - - - - - - - - $1,733
55,979
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
05: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES Savings:
$7,248
Cost:
-
- - - - - - $10,082 430 $(-2,881) - $47 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,082
430
gal
$(-2,881)
-
$
$47
-
$
TOTAL RECOMMENDED Savings:
$60,107
Cost:
$104,737
$22,427 725,381 $22,641 2,488 $7,791 2,291 $10,082 430 $(-2,881) - $47 - $22,427
725,381
kWh
$22,641
2,488
kW-months/year
$7,791
2,291
MMBtu
$10,082
430
gal
$(-2,881)
-
$
$47
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Personnel Changes Ancillary Material Cost