IAC logo
IAC Assessment: MS0079
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0079
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Conveyor Systems
NAICS n/a
SIC 3535 - Conveyors And Conveying Equipment
Sales $50,000,000-$100,000,000
# of Employees 380
Plant Area (Sq.Ft.) 304,000
Annual Production 35,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $243,110 7,837,339 kWh $0.03
Electricity Demand $160,954 17,794 kW-months/year $9.05
Electricity Fees $6,165 - $ -
Natural Gas $142,844 48,497 MMBtu $2.95
TOTAL ENERGY COSTS $265,730
RECOMMENDED SAVINGS* $136,155 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $32,037
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
01: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$4,514
Cost:
$4,620
$4,514 145,662 - - - - - - - - - - - - $4,514
145,662
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$16,653
Cost:
$30,962
$9,869 317,995 $6,784 698 - - - - - - - - - - $9,869
317,995
kWh
$6,784
698
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,556
Cost:
$616
$1,556 50,117 - - - - - - - - - - - - $1,556
50,117
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,390
Cost:
$541
$962 31,067 $428 44 - - - - - - - - - - $962
31,067
kWh
$428
44
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
05: 2.2443 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR Savings:
$9,480
Cost:
$955
- - - - $9,480 3,214 - - - - - - - - -
-
kWh
-
-
kW-months/year
$9,480
3,214
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$8,888
Cost:
-
- - - - - - - - $8,888 551,250 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$8,888
551,250
lb
-
-
$
-
-
$
07: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$12,074
Cost:
$13,000
- - - - - - $2,189 651 - - - - $9,885 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,189
651
gal
-
-
lb
-
-
$
$9,885
-
$
08: 4.4520 ELIMINATE SHIFT Savings:
$81,600
Cost:
-
- - - - - - - - - - $81,600 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$81,600
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$136,155
Cost:
$50,694
$16,901 544,841 $7,212 742 $9,480 3,214 $2,189 651 $8,888 551,250 $81,600 - $9,885 - $16,901
544,841
kWh
$7,212
742
kW-months/year
$9,480
3,214
MMBtu
$2,189
651
gal
$8,888
551,250
lb
$81,600
-
$
$9,885
-
$
TOTAL IMPLEMENTED Savings:
$32,037
Cost:
$37,078
$15,345 494,724 $7,212 742 $9,480 3,214 - - - - - - - - $15,345
494,724
kWh
$7,212
742
kW-months/year
$9,480
3,214
MMBtu
-
-
gal
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Personnel Changes Ancillary Material Cost