IAC logo
IAC Assessment: MS0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product steel castings
NAICS n/a
SIC 3325 - Steel Foundries, Nec
Sales $5,000,000-$10,000,000
# of Employees 99
Plant Area (Sq.Ft.) 61,000
Annual Production 2,700 Tons
Production Hrs. Annual 5,880
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $210,459 5,450,469 kWh $0.04
Electricity Demand $87,718 19,936 kW-months/year $4.40
Electricity Fees $(-4,598) - $ -
Natural Gas $102,768 27,985 MMBtu $3.67
TOTAL ENERGY COSTS $467,136
RECOMMENDED SAVINGS* $125,619 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,250
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$356
Cost:
$1,798
$218 6,741 $174 41 $(-36) - - - - - - - $218
6,741
kWh
$174
41
kW-months/year
$(-36)
-
$
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,263
Cost:
$7,718
$1,512 46,307 - - $(-249) - - - - - - - $1,512
46,307
kWh
-
-
kW-months/year
$(-249)
-
$
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$43,945
Cost:
$22,016
- - - - - - $43,945 11,974 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$43,945
11,974
MMBtu
-
-
lb
-
-
$
04: 3.5222 USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) Savings:
$46,250
Cost:
-
- - - - - - - - $46,250 3,700,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$46,250
3,700,000
lb
-
-
$
05: 3.5113 SELL OIL TO RECYCLER Savings:
$205
Cost:
-
- - - - - - - - - - $205 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$205
-
$
06: 4.522 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$33,600
Cost:
$153,600
- - - - - - - - - - $33,600 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$33,600
-
$
TOTAL RECOMMENDED Savings:
$125,619
Cost:
$185,132
$1,730 53,048 $174 41 $(-285) - $43,945 11,974 $46,250 3,700,000 $33,805 - $1,730
53,048
kWh
$174
41
kW-months/year
$(-285)
-
$
$43,945
11,974
MMBtu
$46,250
3,700,000
lb
$33,805
-
$
TOTAL IMPLEMENTED Savings:
$46,250
Cost:
-
- - - - - - - - $46,250 3,700,000 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$46,250
3,700,000
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Solid Waste (non-haz) Administrative Changes