IAC logo
IAC Assessment: MS0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product white bread and buns
NAICS n/a
SIC 2051 - Bread, Cake, And Related Products
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 95,000
Annual Production 65,000,000 Pounds
Production Hrs. Annual 7,592
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,220 4,472,450 kWh $0.02
Electricity Demand $36,763 8,386 kW-months/year $4.38
Electricity Fees $127,914 - $ -
Natural Gas $206,298 41,529 MMBtu $4.97
TOTAL ENERGY COSTS $464,272
RECOMMENDED SAVINGS* $53,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,768
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,330
Cost:
$5,625
- - $9,330 - - - - - - - - - -
-
kWh
$9,330
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,033
Cost:
$5,664
$714 67,116 $861 176 $1,458 - - - - - - - $714
67,116
kWh
$861
176
kW-months/year
$1,458
-
$
-
-
MMBtu
-
-
gal
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,313
Cost:
$90
$326 30,481 $323 66 $664 - - - - - - - $326
30,481
kWh
$323
66
kW-months/year
$664
-
$
-
-
MMBtu
-
-
gal
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$1,271
Cost:
$6,134
$420 39,566 - - $851 - - - - - - - $420
39,566
kWh
-
-
kW-months/year
$851
-
$
-
-
MMBtu
-
-
gal
-
-
$
05: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$20,680
Cost:
$19,019
- - - - - - $20,680 4,161 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$20,680
4,161
MMBtu
-
-
gal
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$9,125
Cost:
$6,500
- - - - - - - - - - $9,125 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$9,125
-
$
07: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$8,264
Cost:
$1,995
- - - - - - $214 43 $8,050 330 - - -
-
kWh
-
-
kW-months/year
-
-
$
$214
43
MMBtu
$8,050
330
gal
-
-
$
08: 3.4155 METER WASTE WATER Savings:
$698
Cost:
$665
- - - - - - - - - - $698 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$698
-
$
TOTAL RECOMMENDED Savings:
$53,714
Cost:
$45,692
$1,460 137,163 $10,514 242 $2,973 - $20,894 4,204 $8,050 330 $9,823 - $1,460
137,163
kWh
$10,514
242
kW-months/year
$2,973
-
$
$20,894
4,204
MMBtu
$8,050
330
gal
$9,823
-
$
TOTAL IMPLEMENTED Savings:
$19,768
Cost:
$12,215
$326 30,481 $9,653 66 $664 - - - - - $9,125 - $326
30,481
kWh
$9,653
66
kW-months/year
$664
-
$
-
-
MMBtu
-
-
gal
$9,125
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Administrative Changes