IAC logo
IAC Assessment: MS0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Convertible Sofas, Sinuous Springs, and Drop-in Coil Springs
NAICS n/a
SIC 3495 - Wire Springs
Sales $10,000,000-$50,000,000
# of Employees 151
Plant Area (Sq.Ft.) 271,702
Annual Production 55,500,000 Pieces
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,354 1,389,508 kWh $0.04
Electricity Demand $31,450 4,478 kW-months/year $7.02
Electricity Fees $1,412 - $ -
Natural Gas $46,279 12,018 MMBtu $3.85
TOTAL ENERGY COSTS $86,363
RECOMMENDED SAVINGS* $67,774 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,366
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,870
Cost:
$1,500
- - $5,870 - - - - - - - - - -
-
kWh
$5,870
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
02: 2.7122 DISCONNECT BALLASTS Savings:
$313
Cost:
$150
$175 5,569 $138 17 - - - - - - - - $175
5,569
kWh
$138
17
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
03: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,944
Cost:
$275
$1,084 35,170 $860 106 - - - - - - - - $1,084
35,170
kWh
$860
106
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,232
Cost:
$7,102
$1,624 39,566 $608 75 - - - - - - - - $1,624
39,566
kWh
$608
75
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
05: 2.1135 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY Savings:
$1,607
Cost:
$561
- - - - $1,607 417 - - - - - - -
-
kWh
-
-
kW-months/year
$1,607
417
MMBtu
-
-
lb
-
-
$
-
-
%
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,564
Cost:
$11,519
- - - - $6,564 1,705 - - - - - - -
-
kWh
-
-
kW-months/year
$6,564
1,705
MMBtu
-
-
lb
-
-
$
-
-
%
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$2,400
Cost:
-
- - - - - - $900 9,600 $1,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$900
9,600
lb
$1,500
-
$
-
-
%
08: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$46,844
Cost:
$20,800
- - - - - - - - - - $46,844 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$46,844
-
%
TOTAL RECOMMENDED Savings:
$67,774
Cost:
$41,907
$2,883 80,305 $7,476 198 $8,171 2,122 $900 9,600 $1,500 - $46,844 - $2,883
80,305
kWh
$7,476
198
kW-months/year
$8,171
2,122
MMBtu
$900
9,600
lb
$1,500
-
$
$46,844
-
%
TOTAL IMPLEMENTED Savings:
$14,366
Cost:
$9,588
$2,883 80,305 $7,476 198 $1,607 417 $900 9,600 $1,500 - - - $2,883
80,305
kWh
$7,476
198
kW-months/year
$1,607
417
MMBtu
$900
9,600
lb
$1,500
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production