IAC Assessment: MS0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Noncurrent-Carrying Wiring Boxes
NAICS n/a
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $50,000,000-$100,000,000
# of Employees 325
Plant Area (Sq.Ft.) 165,000
Annual Production 43,700,000 Pounds
Production Hrs. Annual 6,864
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $290,786 5,445,487 kWh $0.05
Electricity Demand $40,251 11,735 kW-months/year $3.43
Electricity Fees $20,744 - $ -
Natural Gas $173,925 47,935 MMBtu $3.63
TOTAL ENERGY COSTS $592,770
RECOMMENDED SAVINGS* $59,939 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,615
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$4,329
Cost:
$5,125
$3,850 101,993 - - $479 - - - - - - - - - $3,850
101,993
kWh
-
-
kW-months/year
$479
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,624
Cost:
$8,079
$4,150 88,511 $459 198 $1,015 - - - - - - - - - $4,150
88,511
kWh
$459
198
kW-months/year
$1,015
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$292
Cost:
$577
$224 6,448 $33 11 $35 - - - - - - - - - $224
6,448
kWh
$33
11
kW-months/year
$35
-
$
-
-
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$4,931
Cost:
$2,350
- - - - - - $4,931 1,358 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,931
1,358
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
05: 3.4115 RECOVER AND REUSE COOLING WATER Savings:
$37,143
Cost:
$7,666
$(-5,278) (-153,576) $(-812) (-268) - - - - $23,222 24,704,400 - - $20,011 - $(-5,278)
(-153,576)
kWh
$(-812)
(-268)
kW-months/year
-
-
$
-
-
MMBtu
$23,222
24,704,400
Tgal
-
-
$
$20,011
-
Tgal
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$958
Cost:
$1,995
- - - - - - $958 264 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$958
264
MMBtu
-
-
Tgal
-
-
$
-
-
Tgal
07: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$5,005
Cost:
$672
- - - - - - - - - - $5,005 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$5,005
-
$
-
-
Tgal
08: 4.515 INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE Savings:
$1,657
Cost:
$1,256
- - - - - - - - - - $1,657 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$1,657
-
$
-
-
Tgal
TOTAL RECOMMENDED Savings:
$59,939
Cost:
$27,720
$2,946 43,376 $(-320) (-59) $1,529 - $5,889 1,622 $23,222 24,704,400 $6,662 - $20,011 - $2,946
43,376
kWh
$(-320)
(-59)
kW-months/year
$1,529
-
$
$5,889
1,622
MMBtu
$23,222
24,704,400
Tgal
$6,662
-
$
$20,011
-
Tgal
TOTAL IMPLEMENTED Savings:
$16,615
Cost:
$15,132
$8,000 190,504 $459 198 $1,494 - - - - - $6,662 - - - $8,000
190,504
kWh
$459
198
kW-months/year
$1,494
-
$
-
-
MMBtu
-
-
Tgal
$6,662
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ $ $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Disposal Personnel Changes Water Consumption