IAC logo
IAC Assessment: MS0096
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0096
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Rubber Hose
NAICS n/a
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 205
Plant Area (Sq.Ft.) 52,500
Annual Production 13,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $175,841 3,615,768 kWh $0.05
Electricity Demand $26,019 9,606 kW-months/year $2.71
Electricity Fees $49,452 - $ -
Natural Gas $89,034 20,800 MMBtu $4.28
TOTAL ENERGY COSTS $353,522
RECOMMENDED SAVINGS* $382,890 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,062
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product
$ kWh $ kW-months/year $ $ $ gal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,195
Cost:
$7,228
$2,134 44,842 $374 149 $687 - - - - - $2,134
44,842
kWh
$374
149
kW-months/year
$687
-
$
-
-
gal
-
-
$
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$13,603
Cost:
$17,448
$10,983 230,070 - - $2,620 - - - - - $10,983
230,070
kWh
-
-
kW-months/year
$2,620
-
$
-
-
gal
-
-
$
03: 3.8142 DISTILL CONTAMINATED SOLVENTS FOR REUSE Savings:
$19,264
Cost:
$5,738
- - - - - - $19,264 2,822 - - -
-
kWh
-
-
kW-months/year
-
-
$
$19,264
2,822
gal
-
-
$
04: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$346,828
Cost:
$10,000
- - - - - - - - $346,828 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
gal
$346,828
-
$
TOTAL RECOMMENDED Savings:
$382,890
Cost:
$40,414
$13,117 274,912 $374 149 $3,307 - $19,264 2,822 $346,828 - $13,117
274,912
kWh
$374
149
kW-months/year
$3,307
-
$
$19,264
2,822
gal
$346,828
-
$
TOTAL IMPLEMENTED Savings:
$36,062
Cost:
$30,414
$13,117 274,912 $374 149 $3,307 - $19,264 2,822 - - $13,117
274,912
kWh
$374
149
kW-months/year
$3,307
-
$
$19,264
2,822
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ gal $ $
Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product Electricity Usage Electricity Demand Electricity Fees Other Liquid (haz) Primary Product