IAC Assessment: MS0097
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1997
Principal Product Bricks
NAICS n/a
SIC 3251 - Brick And Structural Clay Tile
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 410,000
Annual Production 75,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $164,987 7,051,290 kWh $0.02
Electricity Demand $21,521 2,112 kW-months/year $10.19
Electricity Fees $68,864 - $ -
Natural Gas $1,106,174 343,161 MMBtu $3.22
TOTAL ENERGY COSTS $1,366,726
RECOMMENDED SAVINGS* $119,522 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $39,698
#|Description Savings
Cost
Status Electricity Usage Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Fees Natural Gas Primary Raw Material
$ kWh $ $ $ MMBtu $ $
01: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$78,996
Cost:
$81,321
- - - - $78,996 24,533 - - -
-
kWh
-
-
$
$78,996
24,533
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,746
Cost:
$1,326
- - $4,746 - - - - - -
-
kWh
$4,746
-
$
-
-
MMBtu
-
-
$
03: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$828
Cost:
$482
$828 38,394 - - - - - - $828
38,394
kWh
-
-
$
-
-
MMBtu
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,896
Cost:
$8,648
$2,896 134,525 - - - - - - $2,896
134,525
kWh
-
-
$
-
-
MMBtu
-
-
$
05: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$5,931
Cost:
$1,158
$5,931 275,498 - - - - - - $5,931
275,498
kWh
-
-
$
-
-
MMBtu
-
-
$
06: 4.211 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$26,125
Cost:
$32,289
- - - - - - $26,125 - -
-
kWh
-
-
$
-
-
MMBtu
$26,125
-
$
TOTAL RECOMMENDED Savings:
$119,522
Cost:
$125,224
$9,655 448,417 $4,746 - $78,996 24,533 $26,125 - $9,655
448,417
kWh
$4,746
-
$
$78,996
24,533
MMBtu
$26,125
-
$
TOTAL IMPLEMENTED Savings:
$39,698
Cost:
$43,421
$8,827 410,023 $4,746 - - - $26,125 - $8,827
410,023
kWh
$4,746
-
$
-
-
MMBtu
$26,125
-
$
Savings
Cost
$ kWh $ $ $ MMBtu $ $
Electricity Usage Electricity Fees Natural Gas Primary Raw Material Electricity Usage Electricity Fees Natural Gas Primary Raw Material