IAC Assessment: MS0099
IAC Center Mississippi State
Assessment Year 1997
Principal Product Suit Coats
NAICS n/a
SIC 2311 - Men's and Boys' Suits, Coats, and Overcoats
Sales $5,000,000-$10,000,000
# of Employees 359
Plant Area (Sq.Ft.) 124,000
Annual Production 240,000 Pieces
Production Hrs. Annual 1,920
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $103,867 2,791,032 kWh $0.04
Electricity Demand $66,283 10,428 kW-months/year $6.36
Electricity Fees $6,088 - $ -
Natural Gas $47,940 9,898 MMBtu $4.84
TOTAL ENERGY COSTS $250,322
RECOMMENDED SAVINGS* $29,264 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,607
#|Description Savings
Cost
Status Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost
$ kWh $ MMBtu $ lb $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,607
Cost:
$1,000
- - $4,607 952 - - - - - - -
-
kWh
$4,607
952
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$5,764
Cost:
$4,900
$5,764 187,280 - - - - - - - - $5,764
187,280
kWh
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 3.7198 REDUCE / ELIMINATE USE OF DISPOSABLE PRODUCT Savings:
$14,436
Cost:
-
- - - - $14,832 57,600 - - $(-396) - -
-
kWh
-
-
MMBtu
$14,832
57,600
lb
-
-
$
$(-396)
-
$
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$3,000
Cost:
$6,500
- - - - - - $3,000 - - - -
-
kWh
-
-
MMBtu
-
-
lb
$3,000
-
$
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,457
Cost:
$690
- - - - $1,457 658 - - - - -
-
kWh
-
-
MMBtu
$1,457
658
lb
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$29,264
Cost:
$13,090
$5,764 187,280 $4,607 952 $16,289 58,258 $3,000 - $(-396) - $5,764
187,280
kWh
$4,607
952
MMBtu
$16,289
58,258
lb
$3,000
-
$
$(-396)
-
$
TOTAL IMPLEMENTED Savings:
$4,607
Cost:
$1,000
- - $4,607 952 - - - - - - -
-
kWh
$4,607
952
MMBtu
-
-
lb
-
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ lb $ $ $ $
Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost Electricity Usage Natural Gas Solid Waste (non-haz) Administrative Changes Ancillary Material Cost