Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Mississippi State |
---|---|
Assessment Year | 1998 |
Principal Product | Men's Coats |
NAICS | n/a |
SIC | 2329 - Men's and Boys' Clothing, Not Elsewhere Classified |
Sales | $1,000,000-$5,000,000 |
# of Employees | 214 |
Plant Area (Sq.Ft.) | 42,000 |
Annual Production | 225,000 Pieces |
Production Hrs. Annual | 2,000 |
Location (State) | AL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $56,520 | 1,235,346 | kWh | $0.05 |
Electricity Demand | $28,497 | 6,012 | kW-months/year | $4.74 |
Electricity Fees | $20,674 | - | $ | - |
Natural Gas | $24,025 | 4,201 | MMBtu | $5.72 |
TOTAL ENERGY COSTS | $133,596 | |||
RECOMMENDED SAVINGS* | $17,441 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $12,123 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $1,713 Cost: $5,100 |
$1,073 | 40,739 | $640 | - | - | - | - | - | - | - | - | - | - | - |
$1,073 40,739 kWh |
$640 - $ |
- - MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $1,593 Cost: $4,400 |
- | - | - | - | $1,593 | 283 | - | - | - | - | - | - | - | - |
- - kWh |
- - $ |
$1,593 283 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,386 Cost: $1,000 |
- | - | - | - | $1,386 | 247 | - | - | - | - | - | - | - | - |
- - kWh |
- - $ |
$1,386 247 MMBtu |
- - lb |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $2,750 Cost: - |
- | - | - | - | - | - | $1,950 | - | - | - | - | - | $800 | - |
- - kWh |
- - $ |
- - MMBtu |
$1,950 - lb |
- - $ |
- - $ |
$800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $2,012 Cost: $816 |
- | - | - | - | - | - | $10 | 98 | - | - | - | - | $2,002 | - |
- - kWh |
- - $ |
- - MMBtu |
$10 98 lb |
- - $ |
- - $ |
$2,002 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.652 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES |
Savings: $7,360 Cost: $420 |
- | - | - | - | - | - | - | - | $7,360 | - | - | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
$7,360 - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $207 Cost: - |
- | - | - | - | - | - | - | - | - | - | $207 | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$207 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.8112 COMBINE UTILITY METERS |
Savings: $420 Cost: $1,225 |
- | - | - | - | - | - | - | - | - | - | $420 | - | - | - |
- - kWh |
- - $ |
- - MMBtu |
- - lb |
- - $ |
$420 - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $17,441 Cost: $12,961 |
$1,073 | 40,739 | $640 | - | $2,979 | 530 | $1,960 | 98 | $7,360 | - | $627 | - | $2,802 | - | $1,073 40,739 kWh |
$640 - $ |
$2,979 530 MMBtu |
$1,960 98 lb |
$7,360 - $ |
$627 - $ |
$2,802 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $12,123 Cost: $2,645 |
- | - | - | - | $1,386 | 247 | $1,950 | - | $7,360 | - | $627 | - | $800 | - | - - kWh |
- - $ |
$1,386 247 MMBtu |
$1,950 - lb |
$7,360 - $ |
$627 - $ |
$800 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | $ | $ | MMBtu | $ | lb | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Fees | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Administrative Changes | Ancillary Material Cost |