IAC logo
IAC Assessment: MS0107
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0107
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Automotive Electrical Motors
NAICS n/a
SIC 3621 - Motors And Generators
Sales $50,000,000-$100,000,000
# of Employees 382
Plant Area (Sq.Ft.) 545,000
Annual Production 2,700,000 Pieces
Production Hrs. Annual 5,760
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $823,986 26,231,536 kWh $0.03
Electricity Demand $459,241 50,053 kW-months/year $9.18
Electricity Fees $1,323 - $ -
Natural Gas $199,055 51,139 MMBtu $3.89
TOTAL ENERGY COSTS $1,455,348
RECOMMENDED SAVINGS* $321,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $314,402
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,339
Cost:
$2,000
- - - - $9,339 2,668 - - - - - - -
-
kWh
-
-
kW-months/year
$9,339
2,668
MMBtu
-
-
lb
-
-
$
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,380
Cost:
$718
$1,425 43,083 $955 90 - - - - - - - - $1,425
43,083
kWh
$955
90
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$1,719
Cost:
$3,248
$1,719 51,876 - - - - - - - - - - $1,719
51,876
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$96,541
Cost:
$13,936
$26,834 810,668 - - $69,707 19,916 - - - - - - $26,834
810,668
kWh
-
-
kW-months/year
$69,707
19,916
MMBtu
-
-
lb
-
-
$
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,757
Cost:
$20,202
$6,757 204,279 - - - - - - - - - - $6,757
204,279
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,239
Cost:
$761
$3,239 97,890 - - - - - - - - - - $3,239
97,890
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
07: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$12,237
Cost:
-
- - - - - - $12,237 305,933 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,237
305,933
lb
-
-
$
-
-
$
08: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,327
Cost:
$1,690
- - - - - - $3 79 - - $1,324 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3
79
lb
-
-
$
$1,324
-
$
09: 4.5120 CONDENSE OPERATION INTO ONE BUILDING Savings:
$187,809
Cost:
$34,932
$56,934 1,720,106 $26,196 2,469 $4,979 1,427 - - $99,700 - - - $56,934
1,720,106
kWh
$26,196
2,469
kW-months/year
$4,979
1,427
MMBtu
-
-
lb
$99,700
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$321,348
Cost:
$77,487
$96,908 2,927,902 $27,151 2,559 $84,025 24,011 $12,240 306,012 $99,700 - $1,324 - $96,908
2,927,902
kWh
$27,151
2,559
kW-months/year
$84,025
24,011
MMBtu
$12,240
306,012
lb
$99,700
-
$
$1,324
-
$
TOTAL IMPLEMENTED Savings:
$314,402
Cost:
$74,318
$92,244 2,786,929 $26,196 2,469 $84,025 24,011 $12,237 305,933 $99,700 - - - $92,244
2,786,929
kWh
$26,196
2,469
kW-months/year
$84,025
24,011
MMBtu
$12,237
305,933
lb
$99,700
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Solid Waste (haz) Personnel Changes Ancillary Material Cost