IAC logo
IAC Assessment: MS0108
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0108
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Bathtubs
NAICS n/a
SIC 3088 - Plastics Plumbing Fixtures
Sales $10,000,000-$50,000,000
# of Employees 104
Plant Area (Sq.Ft.) 240,000
Annual Production 37,500 Pieces
Production Hrs. Annual 2,000
Location (State) AL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,303 1,028,136 kWh $0.05
Electricity Demand $38,797 8,185 kW-months/year $4.74
Electricity Fees $19,326 - $ -
Natural Gas $59,936 9,405 MMBtu $6.37
TOTAL ENERGY COSTS $215,514
RECOMMENDED SAVINGS* $184,871 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz)
$ kWh $ kW-months/year $ $ $ lb $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,917
Cost:
$3,506
$1,463 31,946 $905 191 $549 - - - - - $1,463
31,946
kWh
$905
191
kW-months/year
$549
-
$
-
-
lb
-
-
lb
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$567
Cost:
$696
$418 9,086 - - $149 - - - - - $418
9,086
kWh
-
-
kW-months/year
$149
-
$
-
-
lb
-
-
lb
03: 2.7134 USE PHOTOCELL CONTROLS Savings:
$3,078
Cost:
$759
$2,272 49,238 - - $806 - - - - - $2,272
49,238
kWh
-
-
kW-months/year
$806
-
$
-
-
lb
-
-
lb
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$1,485
Cost:
-
- - - - $1,485 - - - - - -
-
kWh
-
-
kW-months/year
$1,485
-
$
-
-
lb
-
-
lb
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,162
Cost:
$8,391
$2,334 50,703 - - $828 - - - - - $2,334
50,703
kWh
-
-
kW-months/year
$828
-
$
-
-
lb
-
-
lb
06: 3.2123 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS Savings:
$173,662
Cost:
$4,130
- - - - - - $170,962 322,750 $2,700 7,940 -
-
kWh
-
-
kW-months/year
-
-
$
$170,962
322,750
lb
$2,700
7,940
lb
TOTAL RECOMMENDED Savings:
$184,871
Cost:
$17,482
$6,487 140,973 $905 191 $3,817 - $170,962 322,750 $2,700 7,940 $6,487
140,973
kWh
$905
191
kW-months/year
$3,817
-
$
$170,962
322,750
lb
$2,700
7,940
lb
TOTAL IMPLEMENTED Savings:
$1,485
Cost:
-
- - - - $1,485 - - - - - -
-
kWh
-
-
kW-months/year
$1,485
-
$
-
-
lb
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ lb $ lb
Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz) Electricity Usage Electricity Demand Electricity Fees Solid Waste (non-haz) Solid Waste (haz)