IAC logo
IAC Assessment: MS0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MS0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Mississippi State
Assessment Year 1998
Principal Product Beverages
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 86,700
Annual Production 2,200,000 Pieces
Production Hrs. Annual 4,400
Location (State) MS
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $72,182 1,686,694 kWh $0.04
Electricity Demand $47,216 6,557 kW-months/year $7.20
Electricity Fees $3,188 - $ -
Natural Gas $32,552 6,208 MMBtu $5.24
TOTAL ENERGY COSTS $166,742
RECOMMENDED SAVINGS* $91,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$23,520
Cost:
$9,000
- - - - $23,520 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$23,520
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,198
Cost:
$8,073
$1,013 30,481 $1,153 113 $32 - - - - - - - - - $1,013
30,481
kWh
$1,153
113
kW-months/year
$32
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,589
Cost:
$2,068
- - - - - - $3,589 700 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,589
700
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$149
Cost:
$103
$80 2,345 $67 7 $2 - - - - - - - - - $80
2,345
kWh
$67
7
kW-months/year
$2
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$3,658
Cost:
$10,841
- - - - - - $3,658 713 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,658
713
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$525
Cost:
$1,160
$517 15,533 - - $8 - - - - - - - - - $517
15,533
kWh
-
-
kW-months/year
$8
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$109
Cost:
$27
- - - - $109 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$109
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$18,800
Cost:
-
- - - - - - - - - - - - $18,800 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$18,800
-
$
09: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,485
Cost:
$50
- - - - - - - - - - $3,485 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$3,485
-
$
-
-
$
10: 4.5220 MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE Savings:
$35,681
Cost:
$63,600
- - - - - - - - $3,699 - $27,822 - $4,160 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,699
-
$
$27,822
-
$
$4,160
-
$
TOTAL RECOMMENDED Savings:
$91,714
Cost:
$94,922
$1,610 48,359 $1,220 120 $23,671 - $7,247 1,413 $3,699 - $31,307 - $22,960 - $1,610
48,359
kWh
$1,220
120
kW-months/year
$23,671
-
$
$7,247
1,413
MMBtu
$3,699
-
$
$31,307
-
$
$22,960
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $